Option 1 - what is the minimum number of cycles
NC-v4.1 WEc3:Optimize Process Water Useposted by Gustavo De las Heras Izquierdo on
Hello,
Let's say that my project has a bad quality of potable water, and the concentration levels are the same as Table 2. Therefore, the maximum number of cycles would be "1 cycle".
Ceiling system comprised of Particle Board - Composite Wood or Ceilings Category?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Iris Meeker on
Question on how to classify a Wood Ceiling product. We have a suspended wood ceiling system that is NAUF. However, it does not have CDPH testing completed.
Piping Insulation
NC-v4 EQc2:Low emitting materialsposted by Megan White on
For new construction projects, the Ref Guide excludes insulation around HVAC ducts from the IEQc2 requirements (p.668).
Demand Response for Residential buildings
NC-v4 EAc4:Demand responseposted by Amanda Cunningham on
Has anyone pursued this credit for a multifamily building? I'm assuming the automated demand response would only apply to common areas under the building management's control.
Should archaeological works, taking place before construction start, be included in ESC Plan?
NC-v4 SSp1:Construction activity pollution preventionposted by Agata Mozer on
Dear All,
Can you round percentages on indoor water use reduction?
NC-v4 WEc2:Indoor water use reductionposted by Nate Shroyer on
Hi! Our project is currently meeting 49.95% reduction on indoor water use. Does anyone have any experience about whether it is possible to round this up to 50% for the maximum of 6 poin
EA Credit: Enhanced Commissioning
CI-v4 EAc1:Enhanced commissioningposted by Lawrence Rennell on
What level of testing is actually required for LEED V4 enhanced commissioning envelope testing?
Upcoming Peer Networks Webinar: How to use the Building Environmental Justice Tool for your next project
posted by Jennifer Zakrzewski on
Hello Green Gurus,
IAQ Testing, Option 2: Air Testing - Path 1 and 2
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Nadia Bini on
We are pursing this credit under LEEDv4.1 Option 2: Air Testing, "Path 1: Particulate Matter and Inorganic Gases" and "Path 2: Volatile Organic Compounds".