Question regarding Occupancy sensor
NC-v4 EAp1:Fundamental commissioning and verificationposted by Nagaraj Sankar on
How can we show and prove, here are the palces we gave an ocupancy and daylight sensor for manufacturing project? and Is there gudelines used to follow to place sensor on
tools/process for modeling roof deck surface temperature
posted by Chris Flint Chatto on
Anyone aware of tools or workflows for modeling of a specific outdoor space and effective surface temperatures? We've done a goodly amoutn of microclimate simulations, but never explicitly fa
Commingled Waste v4 Documentation
NC-v4 MRc5:Construction and demolition waste managementposted by Samantha Lee on
What is required to be submitted for commingled waste in LEED Version 4? Does the commingled waste have to sent to a Certified Recycling Institute?
Waste Oil as renewable energy
NC-v4.1 EAc5:Renewable Energyposted by Vitor Leite Goncalves on
Dear all,
exhaust fan/fume hood
Schools-NC-v4 EQp3:Minimum acoustic performanceposted by Kai Starn on
Hi, working on a new school k-12 project with a chemistry lab. Does the 40 dBA background noise requirement need to be met concerning the fume hood?
LEED v4.1 If all products in one category comply with the VOC emissions evaluation do we need to list the cost or surface area?
NC-v4 EQc2:Low emitting materialsposted by Summer Gorder on
We are having a tough time getting the costs from our subs. The subs says that the cost is bundled with other material and they can't break it up.
LEED O+M v4 Pilot Credit Integrative Process- Participation in the Forum
Pilot-Credits IPpc101:Integrative Processposted by Yanjun Xing on
Our project is pursuing LEED O+M plantinum certification, during the whole O&M period, we establish an integrative process team to improve our work efficiency. According to the owner’s pro
TX losses
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Omar Elrawy on
Hi,
Just to confirm, for LEED Datacentre we do not model the transformer losses right?
Hence we do not have specific requirement for the losses at different part load?
Daylight Study - Approach for partial wall coverings / multiple materials
CI-v4.1 EQc7:Daylightposted by Yarden Harari on
Hi All,
Has anyone come across a project that has multiple treatments on a wall (like an acoustic band), or multiple flooring finishes that are similar in shade / reflectance values?