Forum quick links
ICOP AHRI 340/360
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
As for the mandatory provisions according to ASHRAE 90.1-2007, Tab. 6.8.1A refers to ICOP with test procedure AHRI 340/360.
Replacing High-mercury lamps in Performance Period before useful life
EBOM-v4 MRc2:Purchasing - lampsposted by on
If the overall average of 70 picograms per lumen hour is not satisfied, and the lamps identified to have high mercury content do not complete their useful life before the performance period en
Group Approach
posted by Ricardo Sá on
Dear All,
Regarding LEED V4 – Group approach, I would like to clarify If may I use the group approach for the following:
25 feet (7.5 meter) Smoking Prohibition
EBOM-v4 EQp2:Environmental Tobacco Smoke Controlposted by Wes Baek on
Hi all,
Is there any alternative when our team cannot implement 25 feet smoking prohibition policy due to a restricted project area?
Short term bicycle storage
NC-v4 LTc6:Bicycle facilitiesposted by Deerns Italia on
Hello everybody,
Painting
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Lise Dannesboe on
Hi - is it possible to paint the pavement to get the wanted SRI-value for the non-roof? And is there any specific requirements for such a paint?
BR, Lise
is it product or category?!
NC-v4 EQc2:Low emitting materialsposted by sara m on
To achieve the low emittig material credit, it says that category of paintings needs to agree with 90% emission and 100% VOC,, does this mean that each product under category of painting needs to a
adjusted dailyuses for urinal when restroom without urinal exist
CS-2009 WEp1:Water Use Reductionposted by Cathy W on
The technical advice is like this: The floor plans for PIf4 indicate that the project includes unisex restrooms that do not contain urinals.