Forum quick links
MR TAG asks: how do we fix Option 1? We need your ideas.
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Mikhail Davis on
As the current Chair of MR TAG, and a member of the Sub-group on Raw Materials Extraction and Sourcing (aka MRc3), I thought it would be a good idea to see if we could crowd-source some ideas on LE
LEED CI V4 from LEED CS 2009
CS-v4 SSc7:Tenant design and construction guidelinesposted by Belén Valladares López on
We are working with a project that falls under LEED CS 2009. We are pursuing credit SSc9 tenant desing & construction guidelines, but as the building is under construction any future commercial
LED lamps
EBOM-v4 MRc2:Purchasing - lampsposted by Karim Farah on
The LEED guideline states that “Mercury-free lamps, such as LEDs, can be included in the pictogram per lumen-hour calculations only if their energy efficiency levels are equal to or greater than th
Providing shuttle service for the nearest bus station
NC-v4 LTc5:Access to quality transitposted by Magda Aghababyan on
Hi all,
updated low-mercury requirements
NC-v4 INc1:Innovationposted by emily reese moody on
We have used the low-mercury lamps credit on numerous v3 projects with no problems, even since they lowered the threshold from 90 picograms to 35; the majority of our projects now use either all LE
Burn Units and Critical care count towards views
Healthcare-v4 EQc8:Quality Viewsposted by Tarik Tadmori on
Developing a hospital and we are trying to assess if we can get this credit or not.
RECs or Carbon Offsets and prices
NC-v4 EAc7:Green power and carbon offsetsposted by Francis Hernández on
Being a contractor (GC), we are tasked with putting a bid together for LEED projects that include as a requirement the green power credit (some here in the US, others overseas).
Determining Furniture Variations Count as Multiple Products
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Johanna Scogin on
I have a rectangular desk and a semi-circular corner desk in the same line by the same manufacturer and wanted to know if these 2 desks counted as different products for the materials calculations?