Forum quick links
Landscape Under Covered
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Anthea Ng on
Hello, My project has a open landscaped G/F partially covered by 2/F structure. Shade tolerant plant species shall be adopted at the covered areas.
Waste-to-energy
EBOM-v4 MRc4:Solid waste management - ongoingposted by Lauri Tähtinen on
Under LEED BD+C v4 Waste Management credit, there is following option: "waste-to-energy systems may be considered waste diversion if the European Commission Waste Framework Directive 2008/98/EC and
Glazing Materials
Pilot-Credits SSpc55:Bird collision deterrenceposted by Lindsey Hinni on
I was just wondering if anyone else has used the Ornilux Bird Protection Glass on their projects. If so - have you found it to be as effective as you thought it would be?
Park aquatic and recreation
posted by Bouygues Sustainability on
Hello, I was wondering under which LEEDv4 we can certify an Aquatic Park in Australia. The project involves the establishment of a new aquatic and recreation centre and community parkland which wi
Shower in the adjoining building
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Karl Heitman on
The project is a stand-alone office building but it's connected to the existing building to the south by a 70' covered link.
LEED Lab Mexico
Pilot-Credits IPpc96:LEED Labposted by David Dominguez on
We are wrapping up our second semester and finishing our performance period, we expect soon to have the first building in Mexico certified under a LEED-Lab.
Cx plan
NC-v4 EAp1:Fundamental commissioning and verificationposted by Joshua Roy on
Does anyone have an example Cx plan?
randomly selected employees
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Hatice G. on
Hi, our building s located in Germany. We choosed Option 3 Approach 2. We ordered a company to do the survey.
Baseline Pumping Power
NC-2009 EAp2:Minimum Energy Performanceposted by Ahmed Labeeb on
Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head.
Baseline Pumping Power
NC-2009 EAp2:Minimum Energy Performanceposted by Ahmed Labeeb on
Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head.