Outdoor Measurement Device location

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Carolina Vergnano  on 

We are working on a project that has a fancoil located on the top of the building that will treat the outdoor air and deliver it to each non densely occupied zone.

5
Sat Jan 25, 2014, 2:37 am

EQc3, EQc5 and filtration requirements

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Steve Loppnow  on 

I'd like to confirm that if a project is pursuing EQc5, that they must use MERV 13 filters for flush-out but can still use MERV 8 filters on equipment that is operated during construction.

7
Default Avatar
Systems Director
HOLOS
LEEDuser Basic Member
15 thumbs up
Sat Jan 25, 2014, 2:30 am
3
Fri Jan 24, 2014, 5:57 pm

CSI Masterformat

NC-2009 MRc4:Recycled Content
posted by  K Nakamura  on 

We have a project that is using CSI MasterFormat 1995, instead of 2004.

5
Default Avatar
LEEDuser Expert
472 thumbs up
Fri Jan 24, 2014, 4:15 pm

Informal Space in a University Setting

Calculating FTEs
posted by  Mike Manzi  on 

Does anyone have any experience with having a large informal waiting space outside of classrooms and determining a transient load.

4
Thu Jan 23, 2014, 11:13 pm

Elevator motors requirements

NC-2009 EAp2:Minimum Energy Performance
posted by  Alex Parella  on 

Sould all kind of elevator motors comply with the requirements of Chapter 10.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jan 23, 2014, 6:36 pm

Enforcement of LE/FE Parking Spaces

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Michael Gillen  on 

I had posted a question about the LE/FE signage and an announcement by the company that they were available for general parking after 8:45 AM.

4
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Thu Jan 23, 2014, 6:35 pm

Split Submissions now and after 2015

General forums
posted by  John Neville  on 

This may be an odd question: Does anyone know what might happen if our project, NC 2.2 registered before 2009, submits for design review this year, then submits for construction review after the 20

5
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Thu Jan 23, 2014, 6:32 pm

Survey for a religious association

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Ralf Lehmann  on 

My customer is a religious association, that want's to certify their own building. The building is only used on Saturday by the members of the assotiation.

2
Thu Jan 23, 2014, 4:57 pm

"relevant criteria"

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Marco Abdallah  on 

The project can comply with the requirements of the credit if the project team can show that the relevant criteria have been met for all HVAC systems serving the area within the project scope, whet

5
Thu Jan 23, 2014, 3:39 pm