Forum quick links
Excavation material from LEED Project is moved outside the LEED boundary on adjacent land.
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Adrian Arenas on
Hello Everyone
Assessment Influence on Design
NC-v4 SSc1:Site assessmentposted by Summer Minchew on
My question ties back to the FAQ response: "The credit requires that projects assess each feature, but it does not require that every assessment influence the project design." This credit was denie
Any minimum area for Roof after exclusions?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Orçun Özhelvaci on
Hello,
Schools - Mold Prevention - IEQc10 - documentation
posted by Jean Hansen on
Has anyone pursued the schools Mold Prevention IEQc10 successfully and have format for the documentation created they would be comfortable sharing?
UL Greenguard Gold Standard version
NC-v4 EQc2:Low emitting materialsposted by Charline SEYTIER on
Hello,
Next Generation Facade: The Ecotone (competition winner)
posted by Z Smith on
Extremely proud to say that the just-announced winner of the international 'Next Generation Facade' design competition is a team led by the 2017-18 EDR Research Fellow, Liz McCormick. T
Solar Shingles
posted by Sara Draper on
I'm looking into using solar shingles as a roofing option for a historic building renovation. Has anyone used them before and have any recommendations?
European ACP for IEQc4.4
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Josef Andersen on
Hi!
I am unsure if there is an European ACP applicable for IEQc4.4? And if there is, where I can find it?
LEED Addition - use Entryway from Adjoining building?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Joyce Kelly on
A two story LEED addition will be regularly accessed from a new stair/elevator tower as well as a corridor at each level that connects it to the existing building.
EV also used as Low-E Preferred parking stall?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Jill Kurtz on
We have a project using an existing parking lot closest to our building and building a new parking lot as well.