Log in
Forum » NC-v4.1 SSc6
Topic

Light pollution reduction Existing site lighting

NC-v4.1 SSc6: Light Pollution Reduction
posted by Erik Heuler on Jun 26, 2024, 12:21 pm

Is existing site lighting, scheduled to remain, required to be included in the Light Pollution Reduction Credit when using the calculation method or is it only for proposed light fixtures? 

...

Last reply: Bill Swanson, Jul 1, 2024, 8:45 am

BUG Rating for Fixtures

NC-v4.1 SSc6: Light Pollution Reduction
posted by Christopher Widdowson on Jun 7, 2024, 10:20 am

I'm having trouble finding manufacturers who provide the...

Last reply: Emily Purcell, Jun 7, 2024, 11:48 am

Uplights in an LZ0 zone

NC-v4.1 SSc6: Light Pollution Reduction
posted by Ellis John Mandia on Apr 11, 2022, 8:36 am

Can the percentage values prescribed in the "Maximum allowed percentage of total luminaire lumens emitted above horizontal" be taken as time-related? For example, if we have uplights in a LZ0...

Last reply: Bill Swanson, Apr 21, 2022, 9:13 am

Wall sconce under overhang/canopy

NC-v4.1 SSc6: Light Pollution Reduction
posted by Jack Ma on Feb 17, 2021, 6:33 pm

Working on a project where the wall sconce will be installed under the building's overhang and canopy.  This will not light up the sky.

Is there a specific way of calculating the reduced (...

Last reply: Bill Swanson, Feb 26, 2021, 10:02 am

What proof is required regarding the switching off of facade lighting?

NC-v4.1 SSc6: Light Pollution Reduction
posted by J Schütz on Dec 11, 2020, 10:53 am

Dear all,

How can it be proved that the façade lighting is switched off at night according to the requirements?

Best regards

Last reply: Bill Swanson, Dec 11, 2020, 11:37 am