Option 2 Natural land cover- rainfall percentile to useNC-v4.1 SSc4: Rainwater managementposted by Agustin Bertolotti on Jul 1, 2022, 4:13 pm
Hi all We are considering a rainwater tank to collect the runoff volume difference between the original site condition and the Project situation. Does anyone knows which rainfall... Last reply: Gustavo De las Heras Izquierdo, Jul 20, 2022, 6:49 pm |
|
Manage rainwater partly out of the LEED project boundaryNC-v4.1 SSc4: Rainwater managementposted by Aris Koliopoulos on Feb 22, 2022, 6:09 pm
Dear All, We are working on an office project where a new building will be erected next to an existing building. Both buildings are essentially located on the same site area however for... Last reply: emily reese moody, May 13, 2022, 3:24 pm |
|
Exemplary performance threshold under v4.1?NC-v4.1 SSc4: Rainwater managementposted by Casey Cullen-Woods on Jan 28, 2020, 9:27 am
Is anyone able to locate if there is a revised threshold for exemplary performance under v4.1 of this credit? My particular project is a non zero lot line Last reply: Lyle Axelarris, Jan 10, 2022, 2:39 pm |
|
Option 2 Natural land cover conditionsNC-v4.1 SSc4: Rainwater managementposted by Allen Cornett on Aug 30, 2021, 8:46 pm
With the "retain on site" verbiage is there no longer an option to retain off-site? I have a project in a development that previous buildings have met the LEED 2009 stormwater quality and... Last reply: emily reese moody, Sep 2, 2021, 3:03 pm |
|
Help! My undeveloped condition is a lakeNC-v4.1 SSc4: Rainwater managementposted by Kristian Kicinski on Aug 4, 2021, 2:58 pm
My project site is located in Seattle WA on a parcel of land created in 1916 when the level of Lake Washington was lowered 9 feet. The parcel is a couple hundred feet from the lake edge and all... Last reply: Gustavo De las Heras Izquierdo, Aug 5, 2021, 6:07 pm |
|
Underground infiltaration system as LID practice?NC-v4.1 SSc4: Rainwater managementposted by Barbara Beckmann on Apr 27, 2021, 2:42 am
For our project a underground... |
|
Is sedimentation filtration required for LID?NC-v4.1 SSc4: Rainwater managementposted by Garrett Ferguson on Jul 8, 2020, 1:06 pm
Is sedimentation filtration required for... |
|
Play area excluded from calculations?NC-v4.1 SSc4: Rainwater managementposted by Maddie Spinski on Jun 19, 2020, 9:26 am
We are building an early childhood education center next to the existing elementary school. Can we exclude the play area and existing parking lot that we are only adding one space to? We aren’t... |
|
Does "Healthcare" refer to HC-v4.1?NC-v4.1 SSc4: Rainwater managementposted by Deb Favaretto on May 21, 2020, 1:07 pm
In both LEED BD+C: New Construction v4.1 and LEED BD+C: Healthcare v4.1, under Requirements in the credit language, USGBC uses the title text: "Percentile of Rainfall Events (1-3 points except... Last reply: Maria Porter, May 25, 2020, 3:27 am |
|
V4.1 credit for v4 project NC-v4.1 SSc4- Rainwater ManagementNC-v4.1 SSc4: Rainwater managementposted by Ryan Harrington on Aug 30, 2019, 12:44 pm
If my project is v4 and choose to use the V4.1 path for rainwater management, does the new point scoring also take effect? Basically my project has a meet the 95th percentile under v4 but if I ... Last reply: Maria Porter, Dec 18, 2019, 2:45 am |