Topic | Recent |
---|---|
On-site EV required if only off-site parking provided?NC-v4.1 LTc8: Electric Vehiclesposted by Rebecca Aarons-Sydnor on Sep 15, 2020, 7:52 am
The first line of the credit states the criteria as "Provide charging infrastructure for electric vehicles for on-site parking." However, under Option 1, it refers to "all parking spaces used by... Last reply: Dave Hubka, Sep 15, 2020, 8:52 am |
|
v4.1 Interpretation- Are spaces required to be "preferred"?NC-v4.1 LTc8: Electric Vehiclesposted by Brian Salazar on Aug 31, 2020, 12:19 pm
Hello! I asked this question under v4.1 Schools, but this side of the world seems better traveled. Do EV charging spaces (or infrastructure) for v4.1 (options 1 or 2) have to be in... Last reply: Brian Salazar, Aug 31, 2020, 2:46 pm |
|
EVSE 2%NC-v4.1 LTc8: Electric Vehiclesposted by Andres Fernandez Alba on Apr 11, 2019, 1:49 pm
Hi Team, Regarding..... Install electrical vehicle supply equipment (EVSE) in 2% of all parking spaces used by the project. Does this mean that each of the 2% parking... Last reply: Brian Salazar, Aug 31, 2020, 12:15 pm |
|
"in close proximity"NC-v4.1 LTc8: Electric Vehiclesposted by emily reese moody on Jul 23, 2020, 3:37 pm
Anyone have any guesses as to what the acceptable proximity is to meet this portion of the requirements? "The raceway shall originate at the main service or subpanel and shall... Last reply: emily reese moody, Jul 29, 2020, 12:34 pm |
|
changes within v4.1 requirementsNC-v4.1 LTc8: Electric Vehiclesposted by emily reese moody on Jul 29, 2020, 11:15 amEmily Purcell Sustainable Design Lead CannonDesign LEEDuser Expert 369 thumbs up July 29, 2020- 11:36 am Discussed this earlier here: https://leeduser.buildinggreen.com/forum/evse-iso-15118-compliance Looking back, my last comment was abut the credit library not showing the newest requirement, but now it is consistent with the 1/2020 addenda. So I guess we can chalk that up to a credit iibrary redesign issue. Log in or register to post comments emily reese moody Sustainability Director, Certifications & Compliance Jacobs LEEDuser Expert 475 thumbs up July 29, 2020- 11:55 am Ooh, thanks. Very... Last reply: emily reese moody, Jul 29, 2020, 11:55 am |
|
Infrastructure vs EVSE Install, can we get points for both for a total of 2 points?NC-v4.1 LTc8: Electric Vehiclesposted by Derick Farfan on Jul 29, 2020, 8:38 am
Still learning...the way the credit is written it makes it appear that it is you go EITHER go for the Infrastructure Credit (6% or 6 spaces, whichever is greater) OR EVSE Install (2% or 2,... |
|
Exemplary Performance for Electric VehiclesNC-v4.1 LTc8: Electric Vehiclesposted by Michelle Lambert on Jun 2, 2020, 11:15 am
Is Exemplary Performance available for installing more electric vehicle charging stations than the required 2% in v4.1? It was not available under Green Vehicles in v4 but wondering if that has... Last reply: Joseph Snider, Jun 3, 2020, 3:23 pm |
|
EVSE- ISO 15118 complianceNC-v4.1 LTc8: Electric Vehiclesposted by Mike Cavanaugh on May 9, 2019, 6:30 pmif a summary addenda document exists or not yet, and if so, where it is... If anybody on the Forum knows, let us know! Thanks! Log in or register to post comments Joseph Snider Principal Integrative... Last reply: Emily Purcell, Jan 29, 2020, 3:36 pm |
|
NC-v4.1 LTc8: Electric VehiclesNC-v4.1 LTc8: Electric Vehiclesposted by Brian Johnson on Jan 2, 2020, 1:48 pm
Hello, I have a question regarding the LTc8 Electric Vehicles credit. If our project only requires 2 parking spaces to have ESVE installed, does that mean each parking space must have an... Last reply: Bipin Karki, Jan 15, 2020, 8:13 am |
|
Are Electric bikes taken into account in LEED?NC-v4.1 LTc8: Electric Vehiclesposted by Maria sAra Di maggio on Jul 23, 2019, 5:39 am
Hi! Are electric bicycles considered electric vehicles? So is the LEED credit NC-v4.1 LTc8 - Electric Vehicles applicable to Bikes? According to this credit, EV are... |