Forum quick links
Shuttle Bus Periodic Service
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Brightworks Sustainability on
Has anyone received a review comment saying that the shuttle buses must be available during periodic times throughout the day, in addition to most frequent commuting hours?
IES ApacheHVAC - Proposed system for VRF
NC-2009 EAp2:Minimum energy performanceposted by Alice chen on
Hi All, I am modelling a VRF system using ApacheHVAC in IES. But have no idea which prototype to choose.
Operable windows
NC-2009 IEQc6.2:Controllability of systems - thermal comfortposted by Charalampos Giannikopoulos on
For an office space with 100 individual working spaces the project team has used operable windows in order to provide thermal comfort control.
R-438A
NC-2009 EAp3:Fundamental refrigerant managementposted by Paula Hernandez on
Hi, We are working in a project that will have kitchen refrigerators, some of this equipment has refrigerant R-438A. I believe that this refrigerant complies with the prerequisite, since it is a HF
Smart vs. Florscore
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Robert Shields on
For flooring products, for example VCT, is Smart Certification the equivalent to Florscore for LEED Certification purposes?
Master's Research Survey
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Vibha Pai on
I am conducting a survey in affiliation with University of Cincinnati for my Master's thesis which would take just 10-15 minutes of your time.
Campus PV dedicated - not connected - to building requires Cx?
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Joyce Kelly on
A portion of a nearby, existing campus PV system has been dedicated - not connected - to our building.
Solar energy used with previous LEED project credit
NC-2009 EAc2:On-site renewable energyposted by Zane Lichtneger on
We have a solar farm on our site that generates about 1.7 million kWh of electricity per year. The array is 100% grid tied selling all energy back to the public utility.
Timing of ASHRAE Level I & II & BAS System Install
EBOM-2009 EAc2.1:Existing building commissioning - investigation and analysisposted by Marie Kirk on
We are going for LEED EBOM v 2009 and need to finish the process by Spring 2017. An engineering firm is getting ready to do an ASHRAE Level I & II audit for us to receive the EA Credit 2.1.
Energy Modeling
NC-v4 EAp2:Minimum energy performanceposted by Muzamil Rafique on
Dear All, i am doing a energy simulation for bank building. software have no option LEED Rating V4. It have only LEED 2009 rating system.