Log in
Forum » NC-v4.1 LTc6
Topic

"Regular Occupants"

NC-v4.1 LTc6: Bicycle facilities
posted by Summer Gorder on Mar 28, 2023, 7:13 pm

What is considerd "Regular Occupants?"

Last reply: Paulina L, Apr 29, 2024, 12:27 pm

Distance to entrance within a large campus

NC-v4.1 LTc6: Bicycle facilities
posted by on Nov 16, 2023, 3:35 pm

Working in predesign on a new construction building within a large site, wherein the site has only one public entrance. That entrance is an existing welcome center, and bicycles are not permitted...

Last reply: Luisa Tonelli, Jan 12, 2024, 7:35 am

shower quantity discrepancy for large-occupancy projects

NC-v4.1 LTc6: Bicycle facilities
posted by Megan Bodin on Jul 6, 2023, 8:46 pm

There is a discrepancy between the requirements for shower quantities for large-occupancy projects.

  • The draft reference guide states “one additional shower for every 750 regular...

Roads with 40 Km / h without bicycle paths or trails are considered as bicycle network?

NC-v4.1 LTc6: Bicycle facilities
posted by Sara BENLOUBA on Feb 19, 2021, 8:15 am

We have a project located in an area where the...

Last reply: David O'Connell, Jun 15, 2023, 8:09 am

Zero Lot Line with required streetscape?

NC-v4.1 LTc6: Bicycle facilities
posted by Elena Khoury on Apr 10, 2023, 6:41 pm

Can streetscape can be excluded from a project boundary if it's required by municipality? For context, there's civil and landscape work that's occuring in front of my project that is required/...

Long-term bicycle storage definition- Covered

NC-v4.1 LTc6: Bicycle facilities
posted by Luc Doucet on Jan 21, 2023, 3:20 pm

Is there a guideline as to what constitutes an acceptable "covering" in order to obtain an adequately protected...

Building less than 100 m from High-capacity Transit Hub- Is a bicycle network still required?

NC-v4.1 LTc6: Bicycle facilities
posted by Hatim Mustafa on Nov 17, 2022, 4:19 pm

Hi everyone!

We have a very interesting situation at hand. Our building is targeting LTc6 - Bicycle Facilities, the project is located in an area that does not have a...

Short-term bicycle storage

NC-v4.1 LTc6: Bicycle facilities
posted by Maria Gamero on Dec 14, 2021, 10:04 am

Hi,

In the office building where the occupants stay for 8 hours a day, is it necessary to have a short-term parking lot for bicycles? Or does it already work with the long-term parking?...

Last reply: Afogreen Build, Dec 21, 2021, 7:23 am

Shower Facilities- 200 yard requirement

NC-v4.1 LTc6: Bicycle facilities
posted by Theresa Lehman on Dec 15, 2021, 9:56 am

In LEED v4, the 200 yard requirement was removed for shower facilities. I'm working on a rural/suburban university project where the project more than meets the short-term and long-term secure...

Last reply: Dave Hubka, Dec 15, 2021, 10:19 am

Shower Facilities on College Campuses

NC-v4.1 LTc6: Bicycle facilities
posted by Theresa Lehman on Nov 17, 2021, 12:47 pm

The college is building a new engineering building on campus. Bicycle storage is planned near the functional entrances and exceeds the short-term and long-term quantity and distance requirements...

Last reply: Emily Purcell, Nov 17, 2021, 3:37 pm