Forum quick links
20% or more of the design team
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Shanwen Hsu on
My project is pursuing option 2
performance period date extension
posted by Elizabeth Seidel on
We are submitting a v4 EB-OM project and need to know if the performance period for all credits ends on the same date and two (2) credits need to be extended to two weeks later - is that
v4.1 Addenda and Trips
NC-v4.1 LTc5:Access to Quality Transitposted by Jessica Eskro on
In the 4.1 addenda section it states:
• For each qualifying transit route, total trips (inbound and outbound) are counted towards the threshold.
Store in a shopping mall with discontinuous boundaries
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Thomas Krysinski on
I am working on the LEED v4 ID+C certification of a store located in a shopping mall. The store is divided in two parts by the mall.
Local Standards Comparisons as Required Documents
NC-v4 SSp1:Construction activity pollution preventionposted by Nate Shroyer on
When working on a project using local standards rather than the 2012 EPA CGP, what is necessary to prove that the local standards are as, if not more, stringent than the CGP. How in depth doe
Campus DES/CHP and EA Credit Optimize Energy Performance
NC-v4 EAc2:Optimize energy performanceposted by Vahid Kompany on
Hello All,
Natural ventilation Parking garages
NC-v4 EQp1:Minimum indoor air quality performanceposted by Antonio Galicia on
Hi everyone
Target Finder outside the US - For Credit NC-v4 EAc2 - Optimize energy performance
NC-v4 EAc2:Optimize energy performanceposted by Worood Shbeikat on
Hi, Is it true that a project outside the US (located in Europe) does not necessarily have the target finder results for Minimum energy performance and Optimized energy performance?
Common corridors in residential building
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
Hi Marcus, My current project is a 40-story hotel building, which has 35 residential levels and 5 non-residential public-space levels.