Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Can I defer any ID credit to submit it w/ construction package ?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Matt Dem  on 

Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri May 22, 2015, 1:23 pm

Where do I upload the response report for Design Final Package ?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Matt Dem  on 

We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri May 22, 2015, 1:22 pm

Reclamation Land

ND-v2009 SLLp3:Wetland and water body conservation
posted by  WT Ho  on 

To stay "untouched" to water body, does it mean that a project with reclaimed portion is ineligible for ND, even if other potion of the future development land is previously developed? What if tha

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Fri May 22, 2015, 3:02 am

Thermal Comfort Survey

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Leed User  on 

I used the survey template provided on this site and was denied the credit saying it did not address all of the ASHRAE 55-2004 environmental variables (air speed, humidity, radiant temperature, and

5
Senior Sustainability Manager
YR&G
LEEDuser Basic Member
27 thumbs up
Thu May 21, 2015, 10:08 pm

Lease Agreement an option to comply with the credit requirements

CS-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Katherine Ann Resurreccion  on 

Hi, We are currently documenting the requirements for this credit and our option in order to comply is to provide a Tenant/Lease Agreement.

3
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Thu May 21, 2015, 5:18 pm
3
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Thu May 21, 2015, 3:20 pm

Process loads

NC-v4 EAc2:Optimize energy performance
posted by  Ake Larsson  on 

In our company, we have introduced LEED as mandatory for all new construction projects.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed May 20, 2015, 9:45 pm

How long do you have to do surveys?

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Parker williams  on 

How long do you have to do surveys? Is this suppose to be ongoing forever?

4
Default Avatar
Energy Engineer
7group
LEEDuser Basic Member
18 thumbs up
Wed May 20, 2015, 9:45 pm

EAp2-4: Energy Star equipment: conversion from kWa to Watts

CI-2009 EAp2:Minimum Energy Performance
posted by  Sarah Simchuk  on 

I'm attempting to register the energy star equipment for my project under Table EAp2-4. The table asks for Rated Power in WATTS.

4
Wed May 20, 2015, 6:14 pm

Rated power

CI-2009 EAp2:Minimum Energy Performance
posted by  Yaser Al Sharif  on 

From where can i take rated power for equipments like laptop , i read it on laptop about 55wh then i divded it by work hours give me 6.7watt , is that right ??????

4
Wed May 20, 2015, 4:51 pm