Forum quick links
Volunteers needed to serve on the AIA COTE Top Ten Technical Review Team
posted by Kim Shinn on
Colleagues
LEED AP O+M
EBOM-v4.1 INc1:Innovationposted by Hatice G. on
Hello,
is it also a prerequisite to have a LEED AP O+M for a recertification project via Arcskoru?
Naturally Ventilated Warehouse
CS-v4 EQp1:Minimum indoor air quality performanceposted by Micaela Smulevich on
We are currently working on incorporating sufficient strategies to naturally ventilate an industrial warehouse.
partially heated space
Warehouses-NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
In the building I am modelling there is a big warehouse that is heated partially only (where the workers are more active, i.e. close to the loading bays).
Define available buildable space
NC-v4.1 LTc4:Surrounding Density and Diverse Usesposted by Cindy Cordo on
In BD+C-v4.1 LTc4, Option 1, Table 1a, in calculating the FAR for nonresidential uses, does on-site parking need to be included in the overall available acreage of the available building space
Warehouse renovation: insulation required per ASHRAE 90.1-2010?
NC-v4 EAp2:Minimum energy performanceposted by Alessandro Zuanon on
Dear all,
Surface Reflectivity calculations for walls with glazing
NC-v4.1 EQc6:Interior Lightingposted by Ricardo Sá on
Dear All,
Survey on Equitable Design Practice
posted by Mike Fowler on
Mithun has a part-time employee Jake Minden who is a graduate student at the University of Washington.
MR Pilot #87 - Verified Recycling Rates
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Michelle Rosenberger on
My project is located in a fairly remote region that ironically is proximate to one of the few verified recycling rate facilities in my region, so we were lucky to be able to pursue this credit.