Forum quick links
Requirements for Hotel Projects
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Shakir Ismail on
Hi Everyone, Just to confirm I have this straight: For designated hotel smoking rooms / smoking restaurants / bars / etc.
What about Greenguard instead of Floorscore
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by María Fernanda Aguirre on
We have a project pursuing LEED CI and the project team is considering to install laminate flooring which is Greenguard certified but not Floorscore.
Using LEED -Schools 2009 templates for LEED Schools 2.0 resubmit
posted by Kevin Flynn on
Our project team is appealing a denied IEQp1 on a LEED Schools v2.0 project.
(Jacob) Labs and Other Energy Intense Areas to be Included?
NC-2009 EAc3:Enhanced Commissioningposted by Brett Beckemeyer on
My current project contains a non-manufacturing lab and research facility. The entire lab and research facilities probably incorporate a large portion of the buildings overall power consumption.
Option 2 - Future residential development
CI-2009 SSc2:Development Density and Community Connectivityposted by Roberto Meza on
Our project is located in a new area in which a residential area will be developed in the near future but is not developed yet. Is it possible to count this area for option 2? Thanks!
Cork Flooring
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Sheela I on
If the Cork flooring exceeds air quality standards established by SCAQMD rule 1168 - Can we consider that it meets the option # 2 of IEQc4.3 "California Department of Heath Services standard"?
Future-Fit Out Spaces LEED Certified or Not
NC-2009 PIf1:Minimum Program Requirementsposted by Catherine Blakemore on
My inquiry is in reference to CIR 10102 I have healthcare project that is a surgical addition at a local hospital. The 2nd floor of this addition is a future fit-out space to be determined.
Can an Off-site parking garage be used to achieve credit?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Breffni O'Rourke on
We are examining a project that will include a multi-story parking garage that will not be within the LEED boundary.
Mult Public Connection just over the 2 mile shuttle bus rule
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Johanna Ordaz on
Our project is located within an Airport Campus. From our project site to the main terminals is about 1 mile.