Forum quick links
LEED Group project - Lighting Boundary
NC-v4 SSc6:Light pollution reductionposted by Edgar Arevalo on
I have a LEED Group project where I am pursuing the Light Pollution Reduction credit. I have a concern regarding the lighting project boundary for a LEED Group site.
Baseline heating source where no fossil fuel is provided to building
NC-v4 EAp2:Minimum energy performanceposted by Kevin Gilleran on
Hi,
Soil Testing
NC-v4.1 SSc2:Protect or Restore Habitatposted by Max Krueger on
On page 49 of the LEEDv4.1 guide it states that soil testing is only needed on imported soils. Under Step-by-Step guidance, it states "Soil tests are only required for imported soils".
LEED v4 ID+C – Baseline Envelope Clarification (ASHRAE 90.1-2010)
CI-v4 EAp2:Minimum energy performanceposted by Sen Abraham on
Hello,
We are working on a LEED v4 ID+C office fit-out project with no envelope modifications — the envelope is entirely outside our scope of work.
Integrative Analysis of Building Materials
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by on
The project team is pursuing this pilot credit after achieving BPDO EPD and HPD credits.
Surface Reflectance Furnishings scope
CI-v4 EQc6:Interior lightingposted by Mariana del Valle on
Hi,
Best BIS Certification Consultants in India for Product Approval
posted by BIS Certification on
Many electronic, electrical, and consumer products require BIS certification for India before they can be sold in India.
Question on LEED v4 NC, OEP 2024 Update – eligibility of off-site solar PPA without EACs for Table 2, GHG, points
NC-v4 EAc2:Optimize energy performanceposted by Mehmet Okumus on
Hello all,
Credit Substitution Point Mismatch
NC-v4.1 SSc4:Rainwater Managementposted by Grace Friedhoff on
We are registered as a v4 project but would like to substitute the Rainwater Management credit for version 4.1. However the credit thresholds do not update in LEEDonline when you substitute.