Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED BD+C v4.1 Transit

LEED v4.1 Discussion Forum
posted by  Deepika Parmar  on 

We are currently working on a metro project comprising 13 stations (a mix of at-grade, elevated, and underground typologies) and 1 depot, spread across multiple locations within the city.

2
Wed Nov 12, 2025, 3:20 pm

Is pc98 required to earn pc99?

Pilot-Credits IPpc99:Design for Enhanced Resilience
posted by  Elizabeth Powers  on 

Can someone clarify if a project needs to have performed the hazard assessment in pilot credit 98 and during pre-design, in order to be eligible for this pilot credit, or does this pilot credit mea

6
Default Avatar
president
Gilleran Energy Management, Inc.
LEEDuser Premium Member
18 thumbs up
Mon Nov 10, 2025, 6:03 pm
3
Thu Nov 6, 2025, 1:51 pm

Integrative Analysis of Building Materials

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by     on 

The project team is pursuing this pilot credit after achieving BPDO EPD and HPD credits.

9
Tue Nov 4, 2025, 4:29 pm

INc1 Bird Collision Deterrence

NC-v4.1 INc1:Innovation
posted by  Sean Smith  on 

Question regarding documenting this innovation credit, the credit requirements highlight the steps for calculating the bird collision rating (BCR), and mention we are to multiply the threat factor

0

Social Equity within the Project Team (Option 1)

Pilot-Credits IPpc90:Social equity within the operations and maintenance staff
posted by  Atlas Turner  on 

Is there a reason why this pilot program for IPpc90 references social equity within the operations and maintenance staff and not social equity within the project team?

6
Tue Nov 4, 2025, 3:50 pm

Smoking on outdoor terrace

NC-v4 EQp2:Environmental tobacco smoke control
posted by  Amanda Cunningham  on 

I am working on a project for a casino that would like to have an outdoor gambling terrace with smoking (completely non-smoking indoors).

0

Regulation of commingled recycling facilities

NC-v4 MRc5:Construction and demolition waste management
posted by  Keith Winston  on 

I keep seeing references to "commingled recycling facilities must be able to provide project-specific diversion rates or an average diversion rate for the facility that is regulated by the local or

53
Fri Oct 31, 2025, 3:59 pm

Pilot-Credits EQpc116: Daylight in nonregularly occupied spaces

NC-v4 INc1:Innovation
posted by  Marie Bizzak  on 

I am working on Daylight in Nonregularly Occupied Spaces. The project is also pursuing Daylight in Regularly Occupied Spaces. My questions pertains to the definition of "Un/Occupied Spaces".

4
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Thu Oct 30, 2025, 9:15 pm