NC-v4.1 LTc8:Electric Vehiclesposted by Joseph Snider on
Has anybody seen an option to install some EVs and then some EV ready to combine Option 1 and 2? In 2009, there was a way to run weighted calcualtions. We have a project doing a little
Carbon Sequestration outside the US
Pilot-Credits SSpc158:Onsite Carbon Sequestration Through Plantingsposted by Oliver Pearce on
Hi,
Construction Waste Tracking Source Separated Question for Concrete and Asphalt Crushed for Aggregate
NC-v4 MRc5:Construction and demolition waste managementposted by Summer Gorder on
I have been a Sustainability/ LEED Consultant in Portland, OR, since starting my business in 2009, and recently am going back to school so to speak about Construction Waste Tracking due to a Muultn
Multi-component recycled content reporting
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Lawrence Rennell on
I have a product which comprises 92% stainless steel and 8% core material. The recycled content of the stainless steel is: 76% post-consumer and 15% pre-consumer.
INTERIOR LIGHTING IN OPEN OFFICES
CI-v4.1 EQc6:Interior Lightingposted by Amal Venugopal on
In LEED V4.1 Interior lighting credit, Lighting control.
LEED Campus Master Site - Individual project and Group project
NC-v4 LTc6:Bicycle facilitiesposted by Edgar Arevalo on
I'm working on a police firing range and training facility.
Is the "No Cooling Tower" ACP still available?
NC-v4 WEc3:Cooling tower water useposted by Deborah Lucking on
The LEED Credit Library still mentions the ACP "No Cooling Tower" under "Pilot Credit".
The Pilot Credit is now closed; are we still able to submit as an ACP under this Credit?
Non Regularly Occupied Spaces
Pilot-Credits EQpc116:Daylight in nonregularly occupied spacesposted by Divya Shroff on
I am trying to document the PILOT credit for a school project and am not sure if the restrooms fall under non regularly occupied spaces.v
Inclusive Design Plan
Pilot-Credits INpc125:Inclusive Designposted by Danielle Eke on
Does anyone that successfully pursued this pilot credit have any documentation guidance?
Social equity within the project team
CS-v4 IPc1:Integrative processposted by Rihab Joucht on
My company has an ESG report, and im expecting to target the pilot credit Social equity within the project team
Is JUST or B CORP mandatory ?