Forum quick links
Tenant owned chiller with R-11?
EBOM-2009 EAp3:Fundamental refrigerant managementposted by Chris Munn on
I am working with a large building in New York. This building has a tenant that has their own chiller that utilizes R-11 refrigerant.
Backup Unit
EBOM-2009 EAp3:Fundamental refrigerant managementposted by on
I am working on a project where the main unit is new and thus in compliance but there is a backup unit which uses CFCs.
Systems Manual
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Michael Lofroos on
Although it is the requirement of the Commissioning Agent to develop the Systems Manual, Operation & Maintenance Systems manuals, can he/she delegate that responsibility to the General Contract
One Conductivity Meter for Multiple towers
EBOM-2009 WEc4:Cooling tower water managementposted by Jessica Hawley on
On our project building there is only one system meter. All cooling towers are interconnected with a single header which is monitored by the conductivity meter.
PDF Template Question
CI-2009 MRc4:Recycled contentposted by elizabeth warlop on
Hello, I may have a question similar to above. In regards to the costs that get included in table L-3 CSI Divisions 3-10 as well as Table L-4 CSI Division 12.
Building on parking spaces
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Tanja Arnesson on
Hi, My project will be built on a parking space that today have at least 300 parking spaces, the new project will have a parking garage that containing at most 230 parking spaces.
Credit Calculations
Pilot-Credits PC19:Whole Building Reuseposted by Christine Robbins-Elrod on
Hi, I'd like to verify if I have documented this Pilot Credit correctly? -I have included exterior windows in the building envelope calculations since the team is preserving all existing windows (b
LEED Project boundary and EAp2, EAc1
NC-2009 EAp2:Minimum energy performanceposted by Kim Sosalla-Bahr on
The project is a new facility, which has a new construction and renovation component. The new building is 6 stories tall, adjacent to an existing 3 story plus roof deck building.
Points for Provision of "Sun Pipes" Under innovation
NC-2009 IDc1:Innovation in designposted by Yong Lee Low on
I am working on a factory project at Jakarta, Indonesia. They are using Sun Pipes to illuminate the work spaces in the office area(at level 2).
Would a Warehouse need to have Occupancy Sensors?
CI-2009 EAc1.2:Optimize energy performance - lighting controlsposted by Augusto Velazquez on
Our project includes an office area and a warehouse area. The office area will have occupancy sensors for each office, bathroom, corridors, etc. The warehouse will not have sensors.