Forum quick links
Draft content - Energy Audit
posted by Jenny Carney on
I took a first pass at content for the Energy Audit best practice, see the uploaded file.
Batteries, mercury lamps, and electronic waste
NC-v4 MRp1:Storage and collection of recyclablesposted by Gregory Martin on
I was curious how much space for these new items needs to be set aside?
Service Hot Water - modeling the circulation pumps for this system
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings,
Regarding modeling the Service Hot Water (SHW) for a project assigned to System 5, our approach was:
LEED ND - Transportation Demand Management : Vehicle-share spaces with high/low frequency transit
ND-Plan-v4 NPDc8:Transportation demand managementposted by Nuttanee Vongveeranonchai on
Dear all,
Report multiple electric meters on Energy Star Portfolio Manager
NC-2009 PIf1:Minimum Program Requirementsposted by Edward Gulick on
I am (finally) wrapping up documentation on a multi-tenant building. It is a LEED-NC project because over 50% of the leaseable space is owner-occupied. The building has 4 electric
LEED V4 NC Healthcare project EAc2 points table guidance?
NC-v4 EAc2:Optimize energy performanceposted by Aditya Potipireddi on
Hello All,
Insulated Metal Panel
NC-v4 EQc2:Low emitting materialsposted by Erin Holdenried on
Any thoughts how an insulated metal panel would (or would not be included) in the credit for the Option 1 path? I assume is would not need to be included as it is a factory-finished metal pro
New Thermal Comfort Tool
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Christopher Schaffner on
Just received an email about a new tool that may be helpful for teams pursuing this credit: The Center for the Built Environment has developed a web-based thermal comfort tool, which is now availa
Previous Owner to Demolish Building Prior to Our New Owner Taking Control
NC-v4 MRp2:Construction and demolition waste management planningposted by Steven Blais on
Our client is negotiating to lease or acquire property to construct new facilities.
Sound Isolation for Regularly Occupied space next to an Electrical room
NC-v4 EQc9:Acoustic performanceposted by Jill Kurtz on
If I have an conference room (occupied area) next to an electrical room, do I...