Forum quick links
Quality views in nonregularly occupied spaces
Pilot-Credits EQpc117:Quality views in nonregularly occupied spacesposted by keerthana gopi on
One of our projects is a 30-storey tower and according to credit requirements we need to give access to views for at least 15% of non regularly occupied areas.
Comprehensive Composting
NC-v4 INc1:Innovationposted by Brightworks Sustainability on
For a large campus we worked on in CA, we submitted this credit. Some documentation tips:
Fire Station Baseline System
NC-v4 EAc2:Optimize energy performanceposted by Jennifer Luce on
I understand fire station has residential spaces. Under 90.1, it requires residential to use PTAC #1 for system type. Due to having gas available, is it correct to model the baseline sy
Autocase
posted by Allen Schaffer on
Does anyone have an opinion of Autocase? https://autocase.com/
EVSE - ISO 15118 compliance
NC-v4.1 LTc8:Electric Vehiclesposted by Mike Cavanaugh on
I'm looking into substituting this credit and pursuing option 1 (2% of spaces) but have a question about the third criteria for EVSE - Vehicle to Grid (ISO 15118) compliance. I've r
Alternative Water Source - Treated Off-Site Harvested Water
NC-v4 WEc2:Indoor water use reductionposted by Vincent Pieri on
Greetings!
NC-v4.1 EAp2
NC-v4.1 EAp2:Minimum Energy Performanceposted by Takashi Hasegawa on
Hi,
Can anyone please check if my understanding is correct, which is on the relationship between LEED V.4.1 and ASHRAE90.1 2016? Below is how I understand;
SSp1 - contractor's stormwater pollution prevention inspection reports needed in a hypothetical USGBC audit?
posted by Jeff Wiedmeyer on
Has anyone had an USGBC audit experience where stormwater pollution prevention inspection reports were requested? My project was awarded LEED Gold under v2009 in the Fall of 2019 and as
Off-site Renewable/Solar Energy
CI-v4 EAp2:Minimum energy performanceposted by Rahil Shah on
Hello,
Introducing open-office plan..!!
posted by James Carvlin on
Hey,
Our company is planning for an open-plan office to encourage collaboration and to promote transparency. But we have found few drawbacks to this open-plan office because,