Forum discussion

NC-v4.1 EAc5:Renewable Energy

LEED v4.1 Renewable Energy Production

We are evaluating the possibility of applying for the Renewable Energy Production credit under LEEDv4.1 for an office building that is receiving renewable energy from the grid.

One of the requirements to meet this credit is that the PV panels must be in the same regional sub-grid.

Is there a map of the energy distribution grid? How do I find out whether the location of PV panels installed by the utility falls in the same regional sub-grid as the project location?

Here’s a link to LEED v4.1 requirement for the Optimize Energy Performance and Renewable Energy Production credits for information.

https://www.usgbc.org/node/11963745?return=/credits/new-construction/v4.1

Regards,

Ruju

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 02/14/2020 - 17:28

Contact your local utility. You might be able to determine the service territory by looking at the tariff sheets. Sometimes they indicate the service area by municipality. 

Fri, 02/14/2020 - 18:55

Thanks Marcus.

Tue, 03/03/2020 - 23:13

I assumed this referred to the eGrid region (for projects in the United States): https://www.epa.gov/sites/production/files/2018-12/egrid2016_subregions_2.jpg As I understand it, these are the grid management regions wherein generation assets are balanced against each other, so within each region adding renewables can displace the fossil fuel generators in that region.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.