Forum quick links
Energy Star Rated Equivalent
posted by Roshan Pradhan on
Does TM-21 tested LED luminaire, with efficiency greater than 94% at 6000 hours meets the alternate equivalent criteria for Energy star rated products?
Appendix 2 default values
posted by Julio Fernandez Amodia on
Dear all,
I am currently estimating the occupancy of a mall building. I have determined the occupancy following Appendix 2 default occupancies from LEED.
Purple Roof
NC-v4 SSc5:Heat island reductionposted by Edgar Arevalo on
Has anyone encountered a project where the client or other circumstances suggested we look into purple roof solution. From the looks of it, it's a green roof solution with optimized stormwate
Entryway system
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by RAMON CHRISTOPHER MEDRANO on
I have a office space project, that will have an entryway system (walk off matt).
LEED ND Plan on Indoor Water Use Reduction
ND-Plan-v4 GIBp3:Indoor water use reductionposted by Michael Wahjudi on
Hi all,
Minimum Program Requirements - Must use a reasonable site boundary: site + building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Theresa Lehman on
This is a complex, multi-part question. An airport project is being phased and has multiple contracts. The scope includes replacing the runways and concrete around the terminals.
Pilot Credit INpc155
Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Controlposted by Roxanne Button on
Has anyone attempted this Pilot Credit yet? Our project is a college science building which was under construction during the COVID-19 shutdown, and already incoporates most of the requiremen
Can the Shower Rooms be included in the Tenant's Sale Lease Agreement?
CS-v4 LTc6:Bicycle facilitiesposted by Nadia Garcia on
Hello LEED community,
LEED PC 66 Community Contaminant Prevention
Pilot-Credits EApc66:Community contaminant prevention - airborne releasesposted by Amanda Brathwaite on
There are some applications, such as LPG (liquid petroleum gas) or diesel-fueled systems in remote locations, where you need to utilize combustion devices (stationary engines, boilers, etc) that do
Recycled Content Report (Post-Consumer & PreConsumer)
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Mu'ath Ad on
Hi, in my current project I am dealing with a manufacturer who provided the Recycled Content with percentage report with mention whether is post-consumer or pre-consumer for some reasons.