Forum quick links
Market-Driven Net-Zero Office Buildings
posted by Mike Manzi on
I'm looking for successful examples of net-zero, Living Building, or similar office buildings that are NOT owned by highly-motivated organizations like RMI or the Bullitt Foundation (or one of
Option 4 Building LCA Clarification
NC-v4 MRc1:Building life-cycle impact reductionposted by Peko Xejis on
Hi, I'm confused about this option, according to the LEEDUSER's viewpoint page of this credit, if I don't have any existing building to use, I cannot pursue this option?
Thanks.
Comingled waste on site - separation at waste facility
CS-v4 MRc5:Construction and demolition waste managementposted by Alicia Ravetto on
Is this always considered a single stream? What method of documentation should the waste facility provide to comply with the requirement of this credit?
October Call
posted by Jennifer Zakrzewski on
Hello everyone,
Here's a reminder that our next monthly call will be taking place next Tuesday, October 8th at 2:00pm EST.
Please feel free to join us!
Water Metering
EBOM-v4 WEc4:Water meteringposted by Jorge Lopez de Obeso on
Hi, could a water mirror (infinity fountain) for humidification purpuses count as other process water?
Smoking Policy
CS-v4 EQp2:Environmental tobacco smoke controlposted by Dean Barone on
Regarding the ETS Control Requirement for LEEDv4 that prohibits smoking inside the building and within the property line. Is it allowed to provide a certain area say 11th floor for smoking?
Low emitting Material- Insulation
CS-v4.1 EQc2:Low-Emitting Materialsposted by Malin Folkesson on
Hi,
ASHRAE 90.1.2010 - Baseline System using Exception of G3.1.1
CI-v4 EAp2:Minimum energy performanceposted by SSN Energy Model on
Hi,
Greetings!
Hollow Metal Doors
NC-v4 EAp2:Minimum energy performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
Hello,
Area Under Construction
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Kelsey Kim on
For the LEED Online form, one of the last sections asks you to explain what alterations and additions were done to the building and give a value for the floor area under construction. I unders