Chiller type for baseline building

CS-v4.1 EAp2:Minimum Energy Performance
posted by  Narguess Kh  on 

I am working on a site in which due to the site limitations and building height restrictions wet solution is not feasible.

1
Tue Jun 8, 2021, 5:43 pm

Energy Model Points for LEED v4.1 Datacenter Building

Data-Centers-NC-v4.1 EAp2:Minimum Energy Performance
posted by  S S  on 

Greetings to All,

Hope all are safe.

We are doing the energy model for office building in which electrical energy only used.

1
Fri Jun 11, 2021, 7:17 pm

Baseline System for a data center

CS-v4.1 EAp2:Minimum Energy Performance
posted by  Narguess Kh  on 

I am working on a Data Center project which is located in Zone 4A. the project is assessed based on C&S. I am confused about the baseline building system selection.

2
Tue Jun 8, 2021, 3:29 pm
6
Default Avatar
M.Sc.
LCEE Life Cycle Engineering Experts GmbH
LEEDuser Basic Member
20 thumbs up
Tue Jun 8, 2021, 1:38 pm
6
Default Avatar
LEEDuser Basic Member
0 thumbs up
Mon Jun 7, 2021, 3:00 pm

Job Opportunity: Entegrity is looking for two Building Certification experts to add to our team

Sustainable Advising Leaders
posted by  Meredith Hendricks  on 

Entegrity is advertising for two positions for Certification experts, one in Little Rock, AR and the other remote. If you know anyone looking for a change send them my way.

0

Design Submittal

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Aaron Kennedy  on 

We are finishing up the design submittal to submit for review, but I cannot find where the overall plans are supposed to be submitted?  Am I missing it somewhere or Is there not a place to sub

2
Robert Rollings Architects
LEEDuser Basic Member
2 thumbs up
Fri Jun 4, 2021, 8:08 pm

IECC 2021

Green Commons
posted by  Joshua Radoff  on 

Has anyone seen a comparison between IECC 2021 and previous versions of the energy code, including ASHRAE 2010?

2
Fri Jun 4, 2021, 4:28 pm

Has the Composting credit been achieved with limited composting receptacles in the building?

Pilot-Credits SSpc129:Comprehensive Composting
posted by  Kristen Fritsch  on 

The amount or spacing of receptacles are not necessarily spelled out, as w/ the recycle bins, and mainly the only place I am drawing from that it should be provided in all spaces is in the "Require