How to get the benefit of automatic shading control device
NC-2009 EAc1:Optimize Energy Performanceposted by Yusuf Turab on
We are using Visual DOE 4.2 software for energy modeling and we are doing one LEED NC project, the project team is planning to do the automatic sensor control window shading device, and how to take
insulation thickness versus energy modeling
NC-v4 EAp2:Minimum energy performanceposted by Jennifer Webb on
We are running into a situation where the insulation is slightly under the R38 (R34.8) that is required per ASHRAE 90.1 yet the energy model shows we are over 10% energy efficient.
Exercise Equipment
Pilot-Credits EQpc78:Design for active occupantsposted by Eric Carbonnier on
Are squishy stress balls that focus on hand reflexology to release stress considered exercise equipment?
Mechanical systems designed but not installed
NC-2009 EAp2:Minimum Energy Performanceposted by April Wang on
Hello all, I am working on a project where a few of the AHUs and FCUs are defined but scheduled to be installed later in the future - phase II.
Roof cleaning and water
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by Kimberly Hosken on
If LEED reviewers are now rejecting hardscape management plans for using power washing (water), does anyone know if using "water" to clean our roof will be rejected?
Reviewer contact before final review
posted by Charalampos Giannikopoulos on
We recently got a review and a comment referring to EAp2 seems quite unreasonable because we think that the reviewer might have misinterpreted the project conditions.
ACP for India
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Renu Rani on
Is there any ACP available for India?
Energy Modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Muzammal Abbas LEED AP (BD+C) on
Hi everyone, I am doing energy modeling for my project in Pakistan and i want to need some clarification and help from seniors: 1) Is it true that for baseline and proposed case HVAC system shoul
Confidential lease agreements cannot be obtained
CS-2009 IEQp1:Minimum IAQ Performanceposted by John Mader on
Our project is an office building with some retail spaces on its lower floors that have already been leased.
Air Filter "Dirty Filter" Allowance in Fan Energy Calcs
NC-2009 EAc1:Optimize Energy Performanceposted by Charles Shinneman on
I cannot find where there is any mention about "air filter loading" allowance requirements for fan power calculations.