Clarification on C&S and MEP Systems
CS-2009 EAc1:Optimize Energy Performanceposted by Emmanuel Gee on
Hello, This is our first Core & Shell project and we have a tenant ready for a two story commercial space.
Mechanically ventilated spaces and naturally ventilated spaces
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
As baseline model I have to model System 6 according to Table G3.1.1A. On a floor the spaces that have windows are naturally ventilated while the internal spaces are mechanically ventilated.
Advises about an orientation in the all project.
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Andres Giraldo on
Hi LEED, we have started the process of LEED EBOM certification in Aug-2013, the facility is categorized as industrial/manufacturing.
Reference to "California Code of Regulation...."
EBOM-2009 IEQp3:Green Cleaning Policyposted by Luciana T. on
To draft our Green Cleaning Program we used the document provided at the Documentation Toolkit on the tab above.
Incorporation of Modulating Exhaust Fan in Model
CS-2009 EAc1:Optimize Energy Performanceposted by Brian Salazar on
Hello again! Our project is in the final throws of appeal and we have been able to secure EAp2 and 4 points for energy efficiency.
Buildings with special cooling coditions - Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Alex Parella on
How could we find a baseline model for an intensely refrigerated building, such as skate / ski indoor pavilion? Does ASHRAE provide with some guide-lines or should we "build" our own baseline, modi
Toilets for Disabled Users
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Anna Korinkova on
Dear LEEDusers. Our project includes toilets for disabled persons and I am not sure how to include this in our calculations.
Occupancy Sensors may be replaced
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Paula Hernandez on
Hi to everyone, Is it possible to replace occupancy sensors by timers to be set for occupied hours, I don´t think so, but I would like to know what you think, thank you
FSC
NC-2009 MRc7:Certified Woodposted by Kenny Midgett on
If you are using FSC Plywood, do you have to use FSC laminate to get full credit for the material?
Definition contiguous floor area
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Lise Dannesboe on
Hi! I was wondering how to interpret the term "contiguous floor area" in IEQ CREDIT 3.2 Option 2 Air Testing.