Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
5
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Mon Mar 10, 2014, 8:56 pm
3
Sustainability Consultant
ECOstudio XV LTD
LEEDuser Basic Member
1 thumbs up
Mon Mar 10, 2014, 6:40 pm

Why the USA Today Article Misses the Point

General forums
posted by  Joshua Radoff  on 

Nadav does a great job here in laying out the issues and problems with the USA Today article.

2
Default Avatar
Sustainable Cost Solutions LLC
LEEDuser Premium Member
195 thumbs up
Mon Mar 10, 2014, 5:58 pm

Performance period for leakage rate

EBOM-2009 EAc5:Enhanced Refrigerant Management
posted by  American University  on 

I'm wondering what performance period would be acceptable for calculating the leakage rate (lbs of refrigerant added and over what time frame) for this credit.

4
Mon Mar 10, 2014, 3:01 pm

Design and Construction credits

LEED for Healthcare forum
posted by  Osama Hassan  on 

Please, I'd like to know the design credits and prerequisites for Healthcare v 2009. Thanks

2
Mon Mar 10, 2014, 2:57 pm

Future HVAC Installation

CS-2009 EAp3:Fundamental Refrigerant Management
posted by  Curt Pascoe  on 

What if your CS building scope does not include HVAC equipment (and therefore no refrigerants)? USGBC requires the entire building to meet this prereq (including tenant spaces).

3
Default Avatar
Built Environment Professional
Built Kansas City LLC
LEEDuser Basic Member
28 thumbs up
Mon Mar 10, 2014, 2:21 pm
4
Default Avatar
Bailey Architects, Inc.
LEEDuser Basic Member
7 thumbs up
Mon Mar 10, 2014, 1:31 pm

Best strategy for an existing campus

LEED Guidance for Campuses and Multiple Buildings
posted by  K A  on 

An existing campus with no LEED certified buildings, no similar buildings except the dorms. What would be the best strategy: certify a group of buildings first then pursue a campus master site.

3
Default Avatar
Consultant
LEEDuser Basic Member
0 thumbs up
Mon Mar 10, 2014, 12:18 pm

MPR 6

CI-2009 EAc3:Measurement and Verification
posted by  Adrienn Gelesz  on 

I have tried to figure out but cannot wrap my head around another subject. MPR 6 requires sharing actual whole-project energy and water usage data for a period of at least 5 years.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Mar 8, 2014, 4:06 am

Rainwater Management in Colorado

EBOM-v4 SSc2:Rainwater management
posted by  Jonathan Miller  on 

Does anyone know what the rules are on engaging in rainwater management in Colorado? I'm under the impression that this is against the law in the state.

3
Sat Mar 8, 2014, 3:44 am