Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Yet another exhaust question

NC-2009 EAc1:Optimize Energy Performance
posted by  Lawrence Lile  on 

We've got an 11,000 square foot maintenance garage for trucks, modeling it under LEED and ASHRAE 90.1-2007.

7
Chief Engineer
Lile Engineering, LLC
LEEDuser Basic Member
59 thumbs up
Mon Apr 20, 2015, 3:42 pm

What is the Air Vapor Barrier?? Roofing Membrane still exempt?

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Michele Helou  on 

Many wall/roof systems have more than one air barrier - what exactly defines what is inside the weather/air barrier - the most interior air barrier? a minimum perm rating?

9
Default Avatar
Principal
LSDesignworks @ Vancouver, BC Canada
LEEDuser Basic Member
9 thumbs up
Sun Apr 19, 2015, 8:48 pm

Entering nonregularily occupied spaces in IEQp1 spread sheet cal

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Vassil Vassilev  on 

Greetings, In the IEQp1 calculation form, provided by USGBC for using in LEED v4, in the Occupancy Category pull-down menu, there is nothing related to equipment rooms, non-occupied stores and sim

2
Sustainability Specialist
Gensler
LEEDuser Basic Member
66 thumbs up
Sat Apr 18, 2015, 7:53 am

Furniture - Piano and Ping Pong Table?

Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishings
posted by  Lea McRoberts  on 

Where does LEED draw the line on furniture? I have a project w/ a spendy piano and ping pong table, do these count? Thank you, Lea

2
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Sat Apr 18, 2015, 5:15 am

Patient rooms showers/lavs/water closet at Rehab Center?

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Saju Varghese  on 

I was wondering if fixtures at patient rooms can be classified as residential or private?

6
Fri Apr 17, 2015, 8:12 pm

62MZ calculator in version 4 LEED

NC-v4 EQp1:Minimum indoor air quality performance
posted by  BEE Incorporations  on 

There is no 62MZ calculator in version 4 LEED here: http://cn.usgbc.org/resources/minimum-indoor-air-quality-performance-calculator Is there a new 62MZ calculator in version 4 LEED?

2
Fri Apr 17, 2015, 4:44 pm

How to calculate the impact of a heat pump, only used for heatin

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Lise Dannesboe  on 

Hi! We use a heatpump system, which is used to supply heat as back-up solution.

3
Building Enclosure Consultant
BPL Enclosure
LEEDuser Basic Member
58 thumbs up
Fri Apr 17, 2015, 3:11 pm

LEED v3 CS Warehouse - MPR Minimum Occupancy Compliance

CS-2009 MPR5:Must comply with minimum occupancy rates
posted by  SIG - Sustainability Main Account  on 

Has there been any previous experience submitting a LEED CS project under v3 with an empty warehouse design, not outfitted with an office and/or restroom to accommodate a FTE?

2
Fri Apr 17, 2015, 1:13 pm

Hi all,

NC-2009 EAp2:Minimum Energy Performance
posted by  Visu Boj  on 

I am working on a certification for a factory having less than 5 percent conditioned area. My process load is also high upto 75 percent.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Apr 17, 2015, 5:03 am

Permanent Irrigation System, Temporary Use of Potable Water

NC-2009 WEc1:Water Efficient Landscaping
posted by  Daniel Costantino  on 

Hello, I am working on a project where there will be a permanent irrigation system.

5
Thu Apr 16, 2015, 9:26 pm