Forum quick links
Yet another exhaust question
NC-2009 EAc1:Optimize Energy Performanceposted by Lawrence Lile on
We've got an 11,000 square foot maintenance garage for trucks, modeling it under LEED and ASHRAE 90.1-2007.
What is the Air Vapor Barrier?? Roofing Membrane still exempt?
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Michele Helou on
Many wall/roof systems have more than one air barrier - what exactly defines what is inside the weather/air barrier - the most interior air barrier? a minimum perm rating?
Entering nonregularily occupied spaces in IEQp1 spread sheet cal
NC-v4 EQp1:Minimum indoor air quality performanceposted by Vassil Vassilev on
Greetings, In the IEQp1 calculation form, provided by USGBC for using in LEED v4, in the Occupancy Category pull-down menu, there is nothing related to equipment rooms, non-occupied stores and sim
Furniture - Piano and Ping Pong Table?
Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishingsposted by Lea McRoberts on
Where does LEED draw the line on furniture? I have a project w/ a spendy piano and ping pong table, do these count? Thank you, Lea
Patient rooms showers/lavs/water closet at Rehab Center?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Saju Varghese on
I was wondering if fixtures at patient rooms can be classified as residential or private?
62MZ calculator in version 4 LEED
NC-v4 EQp1:Minimum indoor air quality performanceposted by BEE Incorporations on
There is no 62MZ calculator in version 4 LEED here: http://cn.usgbc.org/resources/minimum-indoor-air-quality-performance-calculator Is there a new 62MZ calculator in version 4 LEED?
How to calculate the impact of a heat pump, only used for heatin
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Lise Dannesboe on
Hi! We use a heatpump system, which is used to supply heat as back-up solution.
LEED v3 CS Warehouse - MPR Minimum Occupancy Compliance
CS-2009 MPR5:Must comply with minimum occupancy ratesposted by SIG - Sustainability Main Account on
Has there been any previous experience submitting a LEED CS project under v3 with an empty warehouse design, not outfitted with an office and/or restroom to accommodate a FTE?
Hi all,
NC-2009 EAp2:Minimum Energy Performanceposted by Visu Boj on
I am working on a certification for a factory having less than 5 percent conditioned area. My process load is also high upto 75 percent.
Permanent Irrigation System, Temporary Use of Potable Water
NC-2009 WEc1:Water Efficient Landscapingposted by Daniel Costantino on
Hello, I am working on a project where there will be a permanent irrigation system.