Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

FAHU's Fan power and Cooling capacities

CS-2009 EAc1:Optimize Energy Performance
posted by  Manivel Natarajan  on 

Hi All, In my project, proposed building has DX split unit HVAC System.

1
Wed Mar 8, 2017, 4:13 pm

Natural Ventilation Loads Modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Sefa Sahin  on 

Dear All, We are working on residential building in Istanbul/Turkey. The building is heated and cooled by radiators and split AC respectively.

1
Fri Apr 21, 2017, 2:15 pm

Between LEED v4 BD+C:NC or LEED v4 ID+C: CI

LEED Rating System Selection
posted by  Edgar Arevalo  on 

This may be a silly question, but I ask in order for some clarification. I have a particular question using the 40/60 rule.

1
Wed Mar 8, 2017, 10:10 pm

LEED v2009 CS+ID Point

CS-2009 IDc1:Innovation in Design
posted by  Britt Valdez  on 

In seeking IDc1 Innovation and Design point for LEED CS v2009, would the purchase of carbon offsets to reduce natural gas emissions be acceptable in achieving the ID point?

0

Distric Energy System

NC-2009 EAp2:Minimum Energy Performance
posted by  Gina Dederer  on 

Dear all, Currently we are working on an industrial facility pursuing LEED 2009 NC – Major Renovation certification. The building consists of 3 levels.

1
Fri Apr 21, 2017, 2:20 pm

"Exempted" option gone from v5.0 Form

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Erica Downs  on 

On version 4.0 of the LEED Online Form, if you selected "Flooring: Mineral-based" or "Unfinished/Untreated Solid Wood", then under "Referenced Standard" the word "exempt would appear.

1
Thu Mar 16, 2017, 9:32 pm

Critical Path Supply Duct Pressure Drop Calculations

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Bryan Lanier  on 

Currently working on a tenant project. Base building chilled water to each floor supplying DOAS Terminal Units. I'm planning on supplying PD calcs for representative units.

1
Fri Mar 10, 2017, 6:14 pm

What percentage of products purchased count towards the credit.

EBOM-v4 EQc7:Green cleaning - products and materials
posted by  Janet Salisbury  on 

There is some confusion regarding on what percentage of "green" cleaning products are required to get a point. Is it 30% or 75%. Was this something changed in the new version 4?

1
Fri Mar 10, 2017, 5:00 pm

Existing Building, Renovations Taking Place Piecemeal

CI-v4 EQc4:Indoor air quality assessment
posted by  Sara Zoumbaris  on 

We have a university lab project that is renovating a select number of rooms, with varying materials/ systems being replaced at different times.

1
Sat Aug 26, 2017, 6:51 pm

Number of cycles

EBOM-v4 WEc3:Cooling tower water use
posted by  Jonathan Miller  on 

What is the number of cycles necessary to achieve 1 point? 10?

0