Forum quick links
CI v4 Enhanced Energy Performance Sample Form
CI-v4 EAc2:Optimize energy performanceposted by Judhajit Chakraborty on
This is more of a statement, but I wanted to bring to attention the fact that the LEED CI v4 sample form on the usgbc website (below) for Optimize energy performance contains duplicates of the form
Car wash in parking garage
EBOM-2009 WEc1:Water Performance Measurementposted by Rasita Masalskyte on
Hi all, We have a case where there is an office ("main" building) and a separate parking garage (that serves the office) within LEED project boundary.
Enhanced Refrigerant Mgmt credit
NC-v4 EAc6:Enhanced refrigerant managementposted by Michelle Markus on
The ‘Enhanced Refrigerant Management’ credit it mentions a formula to comply with in order to be eligible for the point.
Bicycle Facilities - Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Vasileios Kalfountzos on
Hello everyone, I am currently working on a project located on a relatively industrialised area. That being said, due to the nature of the area there aren't any bicycle networks around the area.
Low-emitting requirements for fabrics?
Retail-CI-v4 EQc2:Low emitting materialsposted by Joanna Peacock on
Hi, My project is a retail fit-out where they are introducing bespoke-made furniture such as sofas and stools.
LEED v4 Materials specification
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Judhajit Chakraborty on
What are the roles and responsibilities (architect, contractor) for specifying new materials credits like this one?
Phases of construction
Schools-2009 MPR2:Must be a complete, permanent building or spaceposted by Cindy Quinn on
I have a situation where an owner is planning phased construction. It is possible, but not definite that both phases will be complete at the time of LEED certification.
Documentation required
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
Our project is a 26-storey building located in Mexico City with more than 20 tenants. The HVAC consists of AHUs and VAV-boxes with recirculation at the AHU.
Compost as an additional recyclable
NC-v4 MRp1:Storage and collection of recyclablesposted by Sara Zoumbaris on
Our project has company-wide recycling programs set up which collect batteries, mercury containing lamps AND electronic waste, however the collection boxes are not out in the open as the collection
pilot closure
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Batya Metalitz on
Based on MR TAG recommendation, this credit is scheduled to close on 3/15/2017. Any projects registered before that date may continue to use the credit on their registered project.