Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

CI v4 Enhanced Energy Performance Sample Form

CI-v4 EAc2:Optimize energy performance
posted by  Judhajit Chakraborty  on 

This is more of a statement, but I wanted to bring to attention the fact that the LEED CI v4 sample form on the usgbc website (below) for Optimize energy performance contains duplicates of the form

0

Car wash in parking garage

EBOM-2009 WEc1:Water Performance Measurement
posted by  Rasita Masalskyte  on 

Hi all, We have a case where there is an office ("main" building) and a separate parking garage (that serves the office) within LEED project boundary.

1
Tue Aug 29, 2017, 6:13 pm

Enhanced Refrigerant Mgmt credit

NC-v4 EAc6:Enhanced refrigerant management
posted by  Michelle Markus  on 

The ‘Enhanced Refrigerant Management’ credit it mentions a formula to comply with in order to be eligible for the point.

1
Thu Mar 2, 2017, 4:49 pm

Bicycle Facilities - Bicycle Network

NC-v4 LTc6:Bicycle facilities
posted by  Vasileios Kalfountzos  on 

Hello everyone, I am currently working on a project located on a relatively industrialised area. That being said, due to the nature of the area there aren't any bicycle networks around the area.

1
Mon Mar 6, 2017, 7:51 pm

Low-emitting requirements for fabrics?

Retail-CI-v4 EQc2:Low emitting materials
posted by  Joanna Peacock  on 

Hi, My project is a retail fit-out where they are introducing bespoke-made furniture such as sofas and stools.

1
Mon Aug 28, 2017, 4:18 pm

LEED v4 Materials specification

CI-v4 MRc3:Building product disclosure and optimization - environmental product declarations
posted by  Judhajit Chakraborty  on 

What are the roles and responsibilities (architect, contractor) for specifying new materials credits like this one?

1
Mon Apr 10, 2017, 2:16 pm

Phases of construction

Schools-2009 MPR2:Must be a complete, permanent building or space
posted by  Cindy Quinn  on 

I have a situation where an owner is planning phased construction. It is possible, but not definite that both phases will be complete at the time of LEED certification.

0

Documentation required

EBOM-v4 EQp1:Minimum indoor air quality performance
posted by  Gustavo De las Heras Izquierdo  on 

Our project is a 26-storey building located in Mexico City with more than 20 tenants. The HVAC consists of AHUs and VAV-boxes with recirculation at the AHU.

1
Thu Aug 31, 2017, 11:58 pm

Compost as an additional recyclable

NC-v4 MRp1:Storage and collection of recyclables
posted by  Sara Zoumbaris  on 

Our project has company-wide recycling programs set up which collect batteries, mercury containing lamps AND electronic waste, however the collection boxes are not out in the open as the collection

1
Thu Mar 2, 2017, 5:24 pm

pilot closure

Pilot-Credits MRpc52:Material multi-attribute assessment
posted by  Batya Metalitz  on 

Based on MR TAG recommendation, this credit is scheduled to close on 3/15/2017. Any projects registered before that date may continue to use the credit on their registered project.

0