Continuous Monitoring Sensors
EBOM-v4 EQc3:Thermal comfortposted by Laura Danzig on
Hi there, a quick question regarding the locations of the sensors/measurements required for this credit.
Manufacturing - prorate energy model
NC-2009 EAp2:Minimum Energy Performanceposted by Dave Hubka on
Hello Marcus, Projects pursuing CS certification are allowed to prorate the model based on owner control.
Different equipment types or all equipment units in scope
CI-2009 EAp3:Fundamental Refrigerant Managementposted by Edgar Arevalo on
For a project I'm currently working on, there are 4 CRAC units and 1 split system AC, both water-cooled.
Use of bidets in an office bathroom for NC 2009 project
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Guillermo Brunzini on
As far as I know, bidets are considered process water fixtures, so do not need be included in the water saving calculation, is that correct?
ID 10209 Mixed-use Building with office not residential use
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Jeffry Magnuson on
Our project is a 122,900 sf building for a single office user. There is 5,000 sf of retail space at the ground floor, currently not leased.
Need help, using new v2009v4_Minimum IAQ Calculator_v03
CI-2009 IEQp1:Minimum IAQ Performanceposted by Edgar Arevalo on
After adding all the values for four floors I'm working on, I then input the design OA intake flow for each floor's AHU. In the summary tab, 3 out of 4 of the Zone systems meet the required OA int
Rainwater Management
Data-Centers-NC-v4 SSc4:Rainwater managementposted by Hadar Farjo on
Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project?
Building Envelope Air infiltration
CS-v4 EAp2:Minimum energy performanceposted by Patrice McVeigh on
Hi All, I am trying to establish if a project can take benefit in the energy model for an improved air infiltration rate for the building envelope over the baseline model.
Building Level Water Metering
EBOM-v4 WEp2:Building-level water meteringposted by sebastian castañeda on
I have a doubt, we have a project of a complex of 3 buildings that is located inside a University Campus.
Diverse Uses within a Shopping Center
CS-v4 LTc4:Surrounding density and diverse usesposted by Frank Sherman on
The planned C+S development is a shopping center that will include retail, restaurants, a grocery store and movie theater.