Forum quick links
Smart irrigation controls
NC-v4 WEc1:Outdoor water use reductionposted by soha yamani on
Hello , in step 6 it is mentioned to Count only irrigation controls whose smart-sensor technology meets the WaterSense criteria, and that it automatically reduce 15% off the baseline , my question
Looking for the best home energy metering system
Homes-v4 EAp2:Energy meteringposted by Phil Vanderloo on
In my research, I seem to be hearing the most about Site Sage by Powerwise as the best available energy metering system out there.
Commingled waste
NC-2009 MRc2:Construction Waste Managementposted by Sundararaj Subburaman on
I have NC Retail 2007 project. The same type of waste is grouped together. For example, the metal includes iron, aluminium and etc, But sorting is done off site.
Furniture
CI-v4 EQc2:Low emitting materialsposted by severine secret on
Is all furniture required to be certified or tested? It used to be only permanently installed items, like workstations, private office furniture, task chairs.
Local equivalent
NC-2009 IEQp1:Minimum IAQ Performanceposted by Paula Rantanen on
We are planning to use local code to meet the prerequisite. There are a few space types for which the local requirement is less stringent.
units to consider
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Angel Vega on
We are in a project with two different volumes that are joint in the first floor by a footbridge (the first floor of both buildings at the same height).
Allowed minor improvents
NC-v4 LTc2:Sensitive land protectionposted by soha yamani on
what the word clearings mean in the allowed minor improvement section for water bodies and wetlands ?
ESC Plan equivalent
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Vanessa Montezuma Ramos on
Hi, we have some doubts about the equivalency of the ESC plan according to our local standards.
Verified Recycling
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Bharati Bhosale on
Apart for from added costs, are there additional requirements that the construction team should be aware of in terms of onsite sorting/ specific dumpster requirements that need to be met in-order t
Baseline system for water loop heat pump in Proposed case
NC-2009 EAp2:Minimum Energy Performanceposted by Mayank Bhatnagar on
Hello everyone, I am working on a residential project. The proposed case HVAC system is Water loop heat pump with cooling tower and natural gas based condensing boilers.