Forum quick links
Thermal Comfort - ACP for Projects in India
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Gopinath Vasu on
Dear All, Kindly clarify the following query regarding Thermal Comfort Design Alternative Compliance Path for projects in India. In ACP it is said that projects shall meet the desired comfort con
Lighting Control
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by VISHESH AGARWAL on
I am working on the project where whole building have occupancy sensor. does need to install 50% of the multi occupant space have lighting control by dimmer.
Green e energy equivalency EKOenergy
CI-v4 EAc6:Green power and carbon offsetsposted by Valentin Grimaud on
Good afternoon, I'm working for a design building company in France. We aim the LEED certification for a shop project. We try do get 2 points for the Green Power and carbon offset credit.
Enhanced Cx - EAc3;
NC-2009 EAc3:Enhanced Commissioningposted by Miles Britz on
Systems Manual; on our Const. Phase submittal the reviewer stated we need to include a Systems Manual. It appears this refers to the Training of staff on the bldg.'s.
Applying for LEED after the building is finished
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Ciaran McCabe on
This is a very general LEED question however is it possible to apply for LEED accreditation for a new building that is finished and handed over to client.
Critical zone
NC-2009 IEQp1:Minimum IAQ Performanceposted by Charalampos Giannikopoulos on
IEQp1 form v06 has a new requirement to describe "how critical zones are selected and how all occupiable zones are accounted for in the determination of the critical zone.
glare control features in retail
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Anna Bak on
Hi, I'm working on the building that on the ground floor has an entrance lobbby with a desk for receptionist and some retail space. On the upper floors we have an office space.
Open Space
NC-v4 SSc3:Open spaceposted by Jorge Lopez de Obeso on
Hi, in order to getting to know the new V4 we are taking a look at each credit and start to getting familiar with them. The leed reference guide doesn't use the same project in both examples for fu
worksheet language
Healthcare-v4 IPc1:Integrative processposted by Duncan Griffin on
The worksheet is somewhat vague about the language that would satisfy LEED reviewers - for example, Site Conditions Baseline assumptions or Massing/Orientation Baseline assumptions could be broad o
no permanent workstations
CS-2009 MPR5:Must comply with minimum occupancy ratesposted by Agnieszka Rylska on
My Client is renovationg a few floors of his office. The renovated floors would only contain canteen, gym and conference rooms without any permanent work stations.