Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Satisfaction rating

EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Survey
posted by  Fareed Alghimlas  on 

Is it acceptable to resort to a 5 point scale on the comfort survey instead of the 7 point?

1
Wed Oct 5, 2016, 5:22 pm

Bus shuttle Service to previous location

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Doreen Kruschina  on 

We have a project in Gallin, a small town with almost no public transport facilities.

1
Tue Aug 30, 2016, 11:14 pm

vegetated roof - depth of medium

CS-2009 SSc7.2:Heat Island Effect—Roof
posted by  Catharina B  on 

Hi In our project we are trying to achieve this credit via the option of a vegetated roof. However, the depth of the growing medium will be less than 6 inches.

1
Mon Aug 29, 2016, 1:58 pm

Crawl Space Inquiry

NC-2009 PIf2:Project Summary Details
posted by  Sara Zoumbaris  on 

Should a crawl space be included in the GSF of a project if it's completely empty (not hosting any mechanical equipment?) If the crawl space DOES have mechanical equipment within it, should it be i

1
Tue Aug 30, 2016, 3:42 am

MBCx scope for LEED-CI

CI-v4 EAc1:Enhanced commissioning
posted by  Mark Benson  on 

The project scope includes new HVAC equipment & controls as well as occupancy sensors for lighting control.

1
Mon Aug 29, 2016, 10:32 pm

Private vegetated terrace vs roof area

CS-2009 SSc7.2:Heat Island Effect—Roof
posted by  Catharina B  on 

Hi On my CS project office mixed with top floor of apartments will be private terrace and I read that private vegetated terraces do not counted towards SS c5.2 so I understand that they also do no

1
Tue Aug 30, 2016, 11:37 am

Glass skylights and existing roof

NC-v4 SSc5:Heat island reduction
posted by  Jonathan Hickerson  on 

I have an existing metal standing seam roof that is historic and will remain, and there is a new skylight going in.

1
Tue Aug 30, 2016, 7:32 pm

Faucet Flowrate at Actual Water Supply Pressure

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Ran Zhang  on 

Hi all, I have a question in regard to the flowrate of faucet, whether it should be based on the 60psi specified by LEED or local water supply pressure.

0

Parking and Landscape

NC-2009 PIf2:Project Summary Details
posted by  SAMY Chamy  on 

Dear All:- Our Project is G+5 Factory Building compare to other floors ground floor (floor area) is less in that place we have landscape and Parking so it under the first floor but parking is j

1
Thu Sep 1, 2016, 11:21 pm

Free waste heat

CS-v4 EAp2:Minimum energy performance
posted by  sergio arus  on 

Hi all, We are working in a retrofitting of an existing multi complex building (offices, hotel, retail ) that is planned to be certified as LEED v4 PLATINUM.

1
Wed Aug 31, 2016, 3:04 pm