Upload IEQc3.2-1. Provide the IAQ Management Plan...
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Zach Hoffman on
Hello, I have been successfully completing IAQ Testing under Option 2 for a few years now and always wondered about this section of the credit template.
AstroTurf
EBOM-2009 WEc3:Water Efficient Landscapingposted by Alexis Voeltner on
What is LEED's stance on AstroTurf? I have a building that replaced all of their grass with this and am curious if it is now considered hardscape.
Bank-Financial Institution
NC-2009 PIf3:Occupant and Usage Dataposted by Joseph Blanco on
How would I calculate transit occupancy for a bank. They have 13 FTE.
LEED V3 2009 - PIf3 occupancy question
NC-2009 PIf3:Occupant and Usage Dataposted by Greg Frankenfeld on
Working on a 5-story residence hall for university client. The top 4 floors are typical bedroom units, with typical support spaces such as study rooms, lounges, etc.
virtual rate
NC-2009 EAp2:Minimum Energy Performanceposted by Razan Nejem on
our project has a district heating with a flat rate of 0.012$/kw and we calculated the virtual rate to be 0.08$/kw can we use the virtual rate or do we have to use the rate provided by the service
LEED point for products sharing the same EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Anne Lautier on
We are currently conducting an LCA for Office Furniture Workspace Products; in order to present the LCA results in the most flexible way and to facilitate the publication of future EPDs, the EPD re
Building Reuse
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by David Browne on
With regard to Credit MRc1.1-Exisitng walls, floors and roof: I have a building which has a fake mansard around its perimeter.
Thermal Comfort - Verification
CS-2009 IEQc7:Thermal Comfort—Designposted by Garrett Ferguson on
Could IEQc8.1 Thermal Comfort - Verification be submitted as an ID credit for CS? I don't completely understand why it is not part of the CS system.
Coffee Room Fixture Flow Rate?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Ian McCall on
Hello, From what I can tell coffee room water fixtures (used for washing coffee cups and hands) in open office spaces are to be included in the credit.
Option 2 for a Partially Enclosed Building (LEED NCv2.2)
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by SIG - Sustainability Main Account on
We performed IAQ testing to meet IEQc3.2 on a subway station. The IAQ levels passed easily, and our approach was recognized by the LEED reviewer as an appropriate approach.