Log in
Forum » NC-v4 EQc1
Topic

Are accessible entrances considered regularly used

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Risto Beatty on Apr 24, 2018, 12:23 pm
Last reply: David Posada, Apr 30, 2018, 7:38 pm

Enhanced strategies: CO2 monitoring for spaces served with ERU & 100% OA

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Sue Bryant on Apr 30, 2018, 6:14 pm

For this option, all densely occupied spaces have to have CO2 monitoring that is tied into the central BAS. Is there an...

Rollout Mats

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Gregory Martin on Apr 13, 2018, 7:39 pm

Credit language indicates "permanent entryway systems". The sample provided in the documentation tool kit has labels with entry mat and walk off mat.

Will the USGBC accept rollout mats...

Last reply: Emily Purcell, Apr 20, 2018, 12:27 pm

Entryway mats required for a dorm that has apartments on the first floor?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Sue Bryant on Mar 14, 2018, 4:29 pm

We have a dorm project that has 4 apartments on the first floor for hall directors. These have their own private exterior entry. There is no further guidance for residential projects. We have...

Last reply: Paula Melton, Mar 22, 2018, 2:59 pm

Permanent entrywway systems- rollout mats?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Keith Robertson on Sep 10, 2017, 9:24 am

The reference guide includes rollout mats in the list of "acceptable permanent entryway systems." LEED 2009 allowed rollout mats to be used as part of the 10' but treated it as non-permanent....

Last reply: Trista Brown, Mar 5, 2018, 1:15 pm

LEED Addition- use Entryway from Adjoining building?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Joyce Kelly on Feb 27, 2018, 5:43 pm

A two story LEED addition will be regularly accessed from a new stair/elevator tower as well as a corridor at each level that connects it to the existing building. A permanent entryway system is...

Last reply: Joyce Kelly, Mar 2, 2018, 9:43 am

NC-v4 EQc1- Enhanced indoor air quality strategies

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by SAJJAD MALIK on Dec 15, 2017, 1:40 am

Dear All,

Can we achieve the enhance indoor air quality strategies point by using 100% fresh air unit without using filtration media in large working halls.

please reply me as soon...

Last reply: Ben Stanley, Jan 15, 2018, 4:53 pm

enhance indoor air quality strategies

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by SAJJAD MALIK on Dec 14, 2017, 7:02 am

Dear All,

Can we achieve the enhance indoor air quality strategies point by using 100% fresh air unit without using filtration media in large working halls.

please reply me...

Last reply: Ben Stanley, Jan 15, 2018, 3:51 pm

Interior Cross Contamination Prevention

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Ricardo Sá on Sep 29, 2017, 6:39 am

LEED EQ Credit Enhanced Indoor Air Quality Strategies requires, for mechanical ventilated spaces (OPTION 1), interior cross contamination prevention, i.e., to “sufficiently...

Last reply: Melissa Kelly, Oct 5, 2017, 10:54 am

Can sanitation maintenance garage apply as a warehouse?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Edgar Arevalo on Feb 10, 2017, 3:13 pm

I ask because according to the LEED v4 reference guide, garage spaces in warehouses and distribution centers are no required to install permanent entryway systems at the doors from the exterior...

Last reply: Pournamasi Rath, Sep 26, 2017, 3:48 pm