Forum quick links
Fire-retarding Putty
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Sherif Ramzy on
Dears, I would really appreciate your kind help.
Airport projects now have space type options available in LEED Online
posted by Ricardo Sá on
Dear All,
HVAC only project
posted by Krysta Aten-Schell on
Looking for guidance on HVAC-only scope project. We are preparing a proposal for an exsiting DoD facility on an Army Base. The RFP requires minimum LEED Silver Certification (formal cer
LEED Indoor water use calculator
NC-v4 WEc2:Indoor water use reductionposted by Jason Garvens on
If a project is using reclaimed greywayter and rainwater stored in a cistern to flush toilets in a building how would one properly account for that on the LEED Indoor water use reduction calculator
Formaldehyde levels too high in ONE room
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Jenni Betancourt on
For a current higher education project, they performed the Air Testing and it shows everything in compliance except for one room showed a level out of compliance for Formaldehyde.
Space with sDA compliant and ASE not compliant does not count for sDA?
NC-v4 EQc7:Daylightposted by Ricardo Sá on
HI,
Home page design
posted by Andrea Lemon on
I am now embarking on the home page design, but before I get started I need input on what you'd like to have there.