Topic | Recent |
---|---|
Watersense LabelNC-v4 WEp2: Indoor water use reductionposted by Indochine Engineering VN on Oct 30, 2017, 6:17 am
Hi LEED expert, My project is Vietnam and there is no Watersense labelled fixtures in my country. Can I just select the fixtures based on the flow rate on their catalog, datasheet for this... Last reply: Trista Brown, Nov 1, 2017, 7:23 pm |
|
Non-LEED Compliant Plumbing FixturesNC-v4 WEp2: Indoor water use reductionposted by Ann E on Oct 17, 2017, 11:38 pm
Hi, I would like to ask if is there any alternative solutions if the public lavatory faucet installed is not a LEED compliance when it comes to it's min flowrate aside from replacements... |
|
flush valve toilet, is the BOWL required to be WaterSense?NC-v4 WEp2: Indoor water use reductionposted by Greg Romanczyk on Nov 22, 2016, 10:21 am
For flush valve toilet, is the bowl itself also required to be Water Sense labeled? Or just the Flush Valve? Last reply: Michelle Rosenberger, Sep 26, 2017, 4:51 pm |
|
Metered Lav Faucets No MoreNC-v4 WEp2: Indoor water use reductionposted by Michelle Rosenberger on Jun 1, 2016, 4:20 pm
I am posting this comment here in addition to the CI forum because there haven't been any responses to questions posed on that forum and I am hoping to get Dylan's take on the removal of the... Last reply: Takayuki Hirota, Sep 21, 2017, 12:18 am |
|
Cooling Towers at Central PlantNC-v4 WEp2: Indoor water use reductionposted by Risto Beatty on Jun 19, 2017, 3:44 pm
If cooling towers are located offsite at a central utility plant, does the project need to comply with the cooling tower requirements of this prerequisite? Last reply: Melissa Kelly, Aug 30, 2017, 12:13 pm |
|
Sharing Water DataNC-v4 WEp2: Indoor water use reductionposted by Nathan Gauthier on Jul 24, 2017, 3:46 pm
Has anybody actually shared their water data yet? My client is asking how to go about this. I guess same is true of energy. I know this was a MPR in the past but don't know anybody who has ever... Last reply: Tristan Roberts, Aug 26, 2017, 8:30 am |
|
Process Water UsesNC-v4 WEp2: Indoor water use reductionposted by Claire DeCamp on Feb 6, 2017, 7:27 pm
Our projects frequently have process water uses in labs or other equipment that is not listed here, as well as laboratory faucets, or hose wash down areas. How are these to be handled in v4? Last reply: caroline schroeder, Aug 23, 2017, 11:14 am |
|
Evaporative water useNC-v4 WEp2: Indoor water use reductionposted by MKK LEED on Aug 4, 2017, 1:03 pm
The new prerequisite states "No... Last reply: Emma Hughes, Aug 7, 2017, 1:58 pm |
|
Process water and residential unitsNC-v4 WEp2: Indoor water use reductionposted by MAUDE PINTAL on May 31, 2017, 1:46 pm
Our project includes a community center and a multi-residential part. The reference guide requires the following: |
|
Blowout toilets in v4NC-v4 WEp2: Indoor water use reductionposted by Ben Roush on Jan 29, 2017, 6:21 pm
In v2009, you could use 3.6 GPF blowout toilets in institutional uses, but could not show savings for using blowout toilets with lower flow. We have an institutional client that wants to use 3.6... Last reply: Ben Roush, Apr 18, 2017, 10:12 am |