Topic

"7% for green vehicles "

NC-v4 LTc8: Green vehicles
posted by Santiago Avila on Mar 18, 2024, 10:53 am

"LT Credit Reduced Parking Footprint. Project teams also pursuing the related credit must reserve 12% of total parking capacity for preferred vehicles (with a required 7% for...

Last reply: Santiago Avila, Mar 19, 2024, 5:21 am

Mixed-use building

NC-v4 LTc8: Green vehicles
posted by CT G on Mar 13, 2024, 2:02 pm

We are working on a project with three towers (30 floors above grade) with a common base (ground floor and the first two floors are shared by the three towers).

Two towers are multi-family...

Last reply: Emily Purcell, Mar 14, 2024, 3:35 pm

Using Existing LEED certified Parking for EV Charger Installation in New Project

NC-v4 LTc8: Green vehicles
posted by sompoche sirichote on Jan 16, 2024, 9:51 am

We have a two-phase project: Phase 1 and Phase 2.

  • Phase 1 was built and completed many years ago, and it earned LEED certification.
  • Phase 2...

Last reply: Emily Purcell, Jan 18, 2024, 4:05 pm

New Construction project with warehouse and bus parking

NC-v4 LTc8: Green vehicles
posted by Dina El-Sady on Mar 5, 2023, 6:14 am

The project is a production building with a connected warehouse and small office building , the parking located within the LEED project boundary is inclusive of bus parking used for building...

How to determine which rating system in Green vehicles credit is more stringent for Campus project?

NC-v4 LTc8: Green vehicles
posted by Maysoon Al-Khuraissat on Dec 15, 2022, 2:31 am

Hi, I'm working on a Campus project that mainly has dormitories, warehouses, services, and offices, the manufacturer's area is almost 65% of the total...

Last reply: Maysoon Al-Khuraissat, Dec 18, 2022, 1:10 am

Floor markings/signage on grass cells

NC-v4 LTc8: Green vehicles
posted by Zirjay Villanueva on Jan 21, 2022, 12:31 am

Hi,

Has anyone tried putting floor markings on grass cells/pavers to indicate the reserved parking spots for...

Last reply: , Jul 14, 2022, 10:30 am

Exclusive Parking Location

NC-v4 LTc8: Green vehicles
posted by Sofia Barahona on Nov 14, 2019, 3:23 pm

The preferred parking spaces of...

Last reply: Michael Mousa, Jun 16, 2022, 10:59 am

EV's owned by a Third-Party?

NC-v4 LTc8: Green vehicles
posted by Randi B. on Feb 23, 2022, 9:16 pm

Given that all reference guide requirements are met concerning the actual equipment that is installed, is a project required to own and operate the EV chargers or could they work with a 3rd...

Last reply: Dave Hubka, Feb 25, 2022, 8:11 am

Electric Charging Stations out of Leed Boundary

NC-v4 LTc8: Green vehicles
posted by Jorge Lopez de Obeso on Sep 3, 2021, 3:15 pm

Hi !

Leed v4:

Is it possible to have electric charging station out of the Leed Boundary ?  This secundary parking lot, where the charging stations are, provides service to the whole...

Last reply: Afogreen Build, Sep 13, 2021, 2:58 am

IEC 62196 Connector

NC-v4 LTc8: Green vehicles
posted by CT G on Jul 6, 2021, 9:25 am

We're working on a project in Brazil where the client wants to install a vehicle charger that complies, and are certified, with regional or local standards for electrical components.

This...

Last reply: Afogreen Build, Jul 19, 2021, 4:45 am