Forum quick links
Painting
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Lise Dannesboe on
Hi - is it possible to paint the pavement to get the wanted SRI-value for the non-roof? And is there any specific requirements for such a paint?
BR, Lise
is it product or category?!
NC-v4 EQc2:Low emitting materialsposted by sara m on
To achieve the low emittig material credit, it says that category of paintings needs to agree with 90% emission and 100% VOC,, does this mean that each product under category of painting needs to a
adjusted dailyuses for urinal when restroom without urinal exist
CS-2009 WEp1:Water Use Reductionposted by Cathy W on
The technical advice is like this: The floor plans for PIf4 indicate that the project includes unisex restrooms that do not contain urinals.
LEEDonline documentation for car pooling
NC-v4 LTc7:Reduced parking footprintposted by soha yamani on
on LEED online it is mentioned " For projects with pooled parking, include justification of allotted space" what does this mean ? what kind of justification is needed here ?
calculating the diverted & total waste
NC-v4 MRc5:Construction and demolition waste managementposted by sara m on
hello,
One Address but buildings are not physically Attached
EBOM-v4 MPR2:Must use reasonable LEED boundariesposted by Jay Murray on
The owner of an office property wants to go for LEED EBOM. There are 3 buildings, two are attached with an architectural overhang and the third is roughly 40 feet away.
MERV 13 Filtration
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Donald Green on
In a CS project that is a renovation with existing mechanical equipment - does the existing mechanical equipment need to have the MERV 13 filtration?
Year of SMACNA sited in IAQ plan older than the one listsed in LLT
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Chad Thurlow on
Hello
Group Approach - construction contract
posted by Ricardo Sá on
Dear All,
Regarding LEEd V4, using the group approach, what real means "group must be under the same construction contract"?
That means that the contractor must be the same?