Project located on reclaimed land
NC-v4 MPR1:Must be in a permanent location on existing landposted by Nermin Hegazy on
I would like to know what is LEED's take on developing a site which is on reclaimed land. The land for the site is not specifically claimed for the project, it has been reclaimed about 1
Insulation Question
NC-v4.1 EQc2:Low-Emitting Materialsposted by Catherine Blakemore on
If pursuing the insulation category, does roof insulation need to be included? I am assuming that it does, but the credit requirements do not specifically say so.
Certification Process
posted by Luisa Scambia on
Hello LEEDUsers,
Could you kindly confirm that my understanding of the LEED certification process/duration is correct:
LEEDv4 HD Quality Views Credit - perimeter area calculation
Healthcare-v4 EQc8:Quality Viewsposted by Tim Hemsath on
Page 740 of reference guide, second paragraph "For other areas, confgure the building foor plates such that the foor area within 15 feet (4.5 meters) of the perimeter exceeds the perimeter area req
Kitchen tab for Core and Shell project
NC-v4 WEc2:Indoor water use reductionposted by Linh Dang on
Hello LEED user experts,
CWMP in ND used for individual buildings (BD+C) within ND boundary?
ND-Plan-v4 GIBc16:Solid waste managementposted by Jackson Ludwig on
Working on an ND project, and curious about the CWMP requirement on this credit. Can this same ND CWMP be used on individual buildilngs pursuing BD+C within the ND boundary for materials
Certification time
NC-v4 IPc1:Integrative processposted by Helena Garcia on
Hi everyone,
Does anyone know if there is a time limit or a deadline from when a project is registered until certification is achieved?
Thank you in advance.
IAQ Testing Stories from the Field
posted by Sarah Gudeman on
Curious on stories when IAQ testing for LEED or WELL didn't come back with "all clear, everything's good" results we all hope for.