Working on an ND project, and curious about the CWMP requirement on this credit.  Can this same ND CWMP be used on individual buildilngs pursuing BD+C within the ND boundary for materials credits?  Or does each building within the ND Boundary that is going for BD+C need to have its own CWMP?  This wasn't entirely clear to me based on the description in the credit.  In other words, can you kill two birds with one stone and use the CWMP from the ND plan to document the Credit Construction and Demolition Waste Management in the v4.1 BD+C rating system for buildings within the ND boundary?