cold room and energy sim
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
We are working a factory which has a small freezer room of 200 sf. How should we model this part?
Construction Activity Pollution Prevention
posted by Ameet AA on
Where can i find which credits are applicable for Mastersite?
Net metering
NC-2009 EAc2:On-Site Renewable Energyposted by Michael Beattie on
Our project will support a PV array capable of supplying 15% of the building's electrical needs.
including furniture in all MR credits
NC-2009 MRc2:Construction Waste Managementposted by Vera Voropaeva on
After the first review we received a comment that furniture calculations should be included in all MR credits 3-7. Furniture is applicable for reused material and thus counted toward MRc3.
Biodiesel?
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by American University on
The glossary definition of "alternative-fuel vehicles use low-polluting, non-gasoline fuels such as electricity, hydrogen, propane, compressed natural gas, liquid natural gas, methanol, and ethanol
Green Walls
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Marcio Alberto Casado Pereira on
Hi all! Can I get any benefit from having green walls in my project, for the purpose of this credit? P.S: It is a Previously Developed Area.
Which type of water needs to be filtered?
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Marcio Alberto Casado Pereira on
Dear all, Please confirm this assumption - our interpretation of this credit is that it only applies to runoff, not to roof captured water. Is this correct?
Health Care - New Construction
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by William Kelly on
For IEQ credit 6.1 Controllability of Systems - Lighting: The requirements for patient areas states "to provide individual lighting controls for 90% (minimum) of patients to enable adjustments to s
Submitting Credits at Very End?
posted by Dave Wortman on
We have a project for which we did a design phase submittal- we are now nearly completion on our construction phase submittal.
IEQ Pr1 - work code in France in place of ASHRAE
NC-2009 IEQp1:Minimum IAQ Performanceposted by Nicolas MOLLE on
Can you confirm me that it is possible, in France, to use the work code to determine the air rate in place of the ASHRAE 62.1-2007 in the places where this local code is more stringent ?