Topic | Recent |
---|---|
Revised Points Thresholds APCCS-2009 EAc1: Optimize Energy Performanceposted by Anna Korinkova on Aug 9, 2017, 4:54 am
We would like to clarify the possible Alternative Compliance Paths (ACP) options for the EAc1 (our project is C&S). There are the three standard ways to achieve credits under the... Last reply: Marcus Sheffer, Aug 31, 2021, 10:24 am |
|
ASHRAE 90.1-2013 for LEED v2009CS-2009 EAc1: Optimize Energy Performanceposted by Elena Arca on Jul 22, 2021, 5:48 pm
Hi, I inherited a LEED project during the... Last reply: Tyler Thumma, Aug 3, 2021, 12:01 pm |
|
Modelling free coolingCS-2009 EAc1: Optimize Energy Performanceposted by Ilaria Piong on Oct 24, 2018, 10:53 am
I have a Core and Shell building where there is an air-to-air heat pump. This HVAC system has the opportunity to do the free cooling in summer season when outdoor air temperatur is lower than... Last reply: Marcus Sheffer, Dec 17, 2020, 2:13 pm |
|
unmet load hoursCS-2009 EAc1: Optimize Energy Performanceposted by Elisabetta Annoni on Apr 5, 2011, 12:05 pm
Hi, for the unmet load hours test there is a throttling range to be defined. As I understand from ASHRAE 90.1 there is no fixed value for this range, how shuold it be defined? Is it... Last reply: Marcus Sheffer, Nov 3, 2020, 2:01 pm |
|
Baseline HVAC System SelectionCS-2009 EAc1: Optimize Energy Performanceposted by Ciaran McCabe on Mar 8, 2017, 11:34 am
I am working on a 9 storey office building (8 levels of office and 1 basement level). The building has a total floor area of 9,400m2. The space heating and cooling will be provided by means of a... Last reply: Marcus Sheffer, Sep 4, 2020, 10:30 am |
|
Modeling Future Tenant SpacesCS-2009 EAc1: Optimize Energy Performanceposted by Anna Kaelin on Mar 12, 2020, 2:12 pm
As our C&S spaces are a future build out we have to predict what the fan power in our FCUs will be. We have manufactures data for all the potential FCUs that could be connected to the... Last reply: Marcus Sheffer, Mar 20, 2020, 2:44 pm |
|
Exemplary Performance?CS-2009 EAc1: Optimize Energy Performanceposted by Brian Salazar on Oct 15, 2019, 1:00 pm
Hello! Is there an Exemplary Performance threshold for this credit? Last reply: Brian Salazar, Oct 15, 2019, 1:40 pm |
|
LEED Interpretation ID# 10421 for ASHRAE 90.1-2010 Adjusted Point Scale for LEED v2009 ProjectsCS-2009 EAc1: Optimize Energy Performanceposted by Silvia Ruiz on Jul 11, 2019, 7:04 pm
Hi, I have a project that was register on February of 2015 and I’m working with ASHRAE 90.1-2010 in the Energy Model Software, I understand that I can use the interpretation 10421 to... Last reply: Silvia Ruiz, Jul 12, 2019, 12:45 pm |
|
Lighting control (occupancy sensor)CS-2009 EAc1: Optimize Energy Performanceposted by Christophe Boussuge on Jun 28, 2019, 10:23 am
Hi all, I had review back for my ASHRAE 90.1-2007 model for a LEED project (office building) and would need some advice on how to address the subject. In the first submission of the... Last reply: Christophe Boussuge, Jul 10, 2019, 2:51 am |
|
90.1-2010 Minimum Equipment EfficienciesCS-2009 EAc1: Optimize Energy Performanceposted by Tom Nichols on Sep 14, 2018, 6:33 pm
I have an interesting situation. I am looking to model a 60 ton (720,000... Last reply: Marcus Sheffer, Sep 17, 2018, 11:17 am |