Topic | Recent |
---|---|
VRP CalculatorCI-2009 IEQp1: Minimum indoor air quality performanceposted by Ciaran McCabe on Jul 27, 2016, 6:52 am
We have a central Air Handling Unit supplying 100% outside fresh air to all the rooms in a building, e.g offices, meeting rooms, conference rooms, etc This air will be tempered to say 18 degrees... Last reply: Michael Smithing, Aug 2, 2016, 3:28 am |
|
IEQp1&c2 DocumentationCI-2009 IEQp1: Minimum indoor air quality performanceposted by Jordan Kirrane on Jul 27, 2016, 9:28 am
Hello, |
|
Minimum Indoor Air Quality Performance CalculatorCI-2009 IEQp1: Minimum indoor air quality performanceposted by Lorenna Lobo on Jul 15, 2016, 4:58 pm
Hello, I'm trying to use the Minimum Indoor Air Quality Performance Calculator. I put the single zone option, but the Voz space is always 0, as well as the Vot space. Is there any problem with... |
|
Transfer Air for IEQp1 achievementCI-2009 IEQp1: Minimum indoor air quality performanceposted by Ricardo Sá on May 2, 2016, 6:36 am
Hello, I'm currently working on a project of a huge supermarket. The building has warehouses and storage rooms. 1_Do these spaces need to be ventilated as per table 6.1 of ASHRAE... |
|
Modification to base building systemsCI-2009 IEQp1: Minimum indoor air quality performanceposted by Ben Hollon on Mar 21, 2016, 3:00 pm
I feel like I've seen parts and pieces of this question in various posts but never asking it directly. This credit requires some assessment/modifications of the entire building, not just of the... |
|
Kitchen Supply AHU (For Make Up Air)CI-2009 IEQp1: Minimum indoor air quality performanceposted by Ciaran McCabe on Jan 8, 2016, 8:03 am
As part of a fit out I the only tenant... |
|
IEQp1 VRP CalculatorCI-2009 IEQp1: Minimum indoor air quality performanceposted by Vassil Vassilev on Nov 13, 2015, 4:49 am
Greetings, Last reply: Vassil Vassilev, Jan 6, 2016, 1:12 am |
|
IEQp1 Reductions in supply air flows due to occupant adjustmentsCI-2009 IEQp1: Minimum indoor air quality performanceposted by Olga Yuil on Sep 25, 2015, 10:27 am
We have a Commercial Interior Project with underfloor air distribution (UFAD) system designed to include adjustable supply air diffusers in the floor, which can be used to adjust the amount of... Last reply: Roger Chang, Jan 5, 2016, 12:39 pm |
|
IEQp1: Minimum Indoor Air Quality PerformanceCI-2009 IEQp1: Minimum indoor air quality performanceposted by Arslan Faisal on Aug 18, 2015, 7:15 am
We are working on a plaza which have office spaces. we submit this project. But in the review report they asking the following documents. As we fill the online VRP Compliance calculator not excel... |
|
Base building systemCI-2009 IEQp1: Minimum indoor air quality performanceposted by Graham Langton on Jul 3, 2015, 11:16 am
Hi, To what extent does the... |