Topic | Recent |
---|---|
How do I update 62MZCalc spreadsheet to represent a fan powered VAV terminal unitCI-2009 IEQc2: Increased Ventilationposted by Jordan Kirrane on Apr 27, 2018, 12:20 pm
Hello, A former colleague has submitted 62MZCalc spreadsheets to show compliance with the IEQc2 additional ventilation credit. We have had to following comment back from the an assessor... |
|
ventilation flow rateCI-2009 IEQc2: Increased Ventilationposted by ilkyaz ceren güçlü on Nov 10, 2014, 7:52 am
Hi, We work on a project in Turkey and I have a trouble about calculations on technical areas. Is it subject %30 increase the flow rate in technical areas? (server rooms,technical rooms... |
|
LEED 2009 ID+C Study Guide Typo? IEQ C2CI-2009 IEQc2: Increased Ventilationposted by Elizabeth Ingram on Jul 3, 2013, 6:12 pm
Hi! The above lists IEQ C2 as 5 points. Am I misunderstanding this? Is it another strange and wondrous EP or ID credit, or suite of credits? The project checklist in the guide lists it as 1... Last reply: Elizabeth Ingram, Jul 4, 2013, 2:09 pm |
|
Non-US ProjectsCI-2009 IEQc2: Increased Ventilationposted by Phillip Cook on May 15, 2013, 11:02 pm
It says that projects outside the US may use a local equivalent. I am in Australia - the Australian regulations are much more stringent than the ASHRAE Standard and so the meeting the minimum... Last reply: Dylan Connelly, May 31, 2013, 5:53 pm |
|
Alternative Compliance Path for Projects outside the USCI-2009 IEQc2: Increased Ventilationposted by Marco Abdallah on Jul 20, 2012, 4:33 am
Hi, Last reply: Dylan Connelly, Jul 26, 2012, 12:04 pm |
|
Increase Ventilation- CorridorCI-2009 IEQc2: Increased Ventilationposted by Simon Sue on May 10, 2011, 2:32 am
Hi, Last reply: David Hubka, May 10, 2011, 2:48 pm |