Forum quick links
How many times can the appeal be submitted?
posted by dia2000@gmail.com dia2000@gmail.com on
As of my understanding, appeals can be submitted as many times as the project team wishes.
Providing a clarification narrative?
posted by Tim Connor on
As part of my review comments I have been asked to provide clarification narratives for several MEP related credits. Notably EAp3 has no required uploads, so I can't upload a narrative document.
Leed NC 2009 - documents to translate in english for reviews
posted by Nicolas MOLLE on
Hello, I'm working on my first certified leed project. My buildings is in France and all documents are written in french.
LEED for Schools 2007
posted by Suzanne Allerton on
2 part question 1 - we are at the threshold between silver and gold. Is it possible to speak to our reviewer. The credit we need is in the Energy model and only involves a 1percent difference.
Submit denied design phase credit for construction final review
posted by Udana Ratnayake on
in one of our projects prerequisite IEQp1 minimum indoor air quality performance was denied both in design preliminary review and final review.
Revising Contractor LEED documentation (v2.2 project)
posted by Elle Brown on
We are reviewing a project for LEED certification (v 2.2) that was designed and constructed by another firm.
Pursuing additional credits after final certification review
posted by jim bell on
We have a project that has received final design and construction review. The project has fallen short of the threshold for Silver. What is the method to pursue additional credits?
time delay for review
posted by Tatjana Ernst on
Hello Everyone, we have a project under review now. The result was expected to be there at 17 Mai 2012! But now is it still open.
Submitting "Design" and "Construction Phase together
posted by Prashant Kulkarni on
Please advise how we could submit "Design" and "Construction" Phase submittals together based on the following situation: 1.
Prerequisite at risk!
posted by Alicja Bieszyńska on
We have just received the Preliminary Design Submittal Review for our project.