in one of our projects prerequisite IEQp1 minimum indoor air quality performance was denied both in design preliminary review and final review. then we submitted it again after doing the required changes as advised by the reviewer. it was denied again in the construction preliminary review. so the project team submitted the prerequisite again for the construction final review. it has been denied again giving the following review comment.

"this prerequisite was previously denied after receiving three full rounds of review Design preliminary, design final and construction preliminary review phases. as the design strategy regarding this credit was not earned in the construction preliminary review an appeal will be necessary should the project wish to obtain this prerequisite"

isn't it possible for us to submit this prerequisite for the construction final review as mentioned by the reviewer? what is the best way to proceed for us to obtain this prerequisite?